Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

18/05/1899

The year in which a vessel’s construction is completed.

Year of ship completion

1891

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Alexander Stephen & Sons

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Lon

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

8 Report of Survey for Repairs, &c.

The listed port to which a given vessel belongs.

Port belonging to

Liverpool

The date of first visit by a surveyor.

Date of first survey

02/05/1899

The individual and/or organisation listed

Ship owner

Bank Shipping Co Ltd

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

J Evans

Location where the document is written.

Location of Document Creation

London

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; SS No 2,99

Recorded information related to a vessel’s movements.

Voyage information

London; Talcahuano

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Bk - Barque

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron and Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

1540

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Annie Speer

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

21/05/1891

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Dundee

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

61052

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

New York 2870

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

18/05/1899

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

W Just & Co

Name of the individual/entity/organisation responsible for authoring the record

Document author

C Martell

Location where a vessel’s survey was undertaken.

Location of Survey

London

Date of the meeting of the Classing Committee.

Date of Classing committee

26/05/1899

The name of the port/place of destination given.

Destined voyage

Talcahuano

A vessel’s means of propulsion.

Propulsion

Sail

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.