Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/02/1892
The year in which a vessel’s construction is completed.
1883
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Elder & Co
The name of the yard where the vessel was built.
Fairfield Yard
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed
D Currie & Co
Name of the individual/entity/organisation responsible for authoring the record
Robert Balfour
Name of surveyor.
Robert Balfour
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 9,91; +LMC 7,91; +NB 7,91; SS Gls No 3-7,91
Recorded information related to a vessel’s movements.
London; Cape
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Glasgow
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Hawarden Castle
The process of transferring a vessel to water, but not necessarily her completion.
11/01/1883
Unique identifier for a given ship, it is assigned by a builder.
269
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
52744
The listed port to which a given vessel belongs.
London
The date of last visit by a surveyor.
20/02/1892
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R Duncan
Location where the document is written.
London
Location where a vessel’s survey was undertaken.
London
Date of the meeting of the Classing Committee.
26/02/1892
The name of the port/place of destination given.
Cape
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4380
Date in which construction of a vessel’s engines were completed.
1891
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.