Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
09/02/1891
The year in which a vessel’s construction is completed.
1890
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Flensburger Schiffsbau Gesellschaft
Unique identifier for a given ship, it is assigned by a builder.
117
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ham
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
The listed port to which a given vessel belongs.
Bremen
The date of first visit by a surveyor.
08/08/1890
The individual and/or organisation listed
Deutsche Dampfschifffahrts Gesellschaft Hansa
Name of the individual/entity/organisation responsible for authoring the record
Emil Padderatz
Name of surveyor.
Emil Padderatz
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Stl; Spar Dk; 1 Dk (Steel & Web Frames & Spar Dk Pt Stl; W S; +LMC 2, 91; L A&C P
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1848
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Also refers to Vessel Schonburg
Name of ship as recorded on the record
Lowenburg
The process of transferring a vessel to water, but not necessarily her completion.
09/12/1890
Name of the shipbuilder as it appears on the record.
W Brederhoff for Flensburger Schiffbau Gesellschaft
The port or place in which the vessel’s construction took place, at the time of writing.
Flensburg
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1842
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Hamburg 1781
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
07/02/1891
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
G A Gramberg
Location where the document is written.
Hamburg
Location where a vessel’s survey was undertaken.
Flensburg
Date of the meeting of the Classing Committee.
13/02/1891
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.