Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/08/1930
The year in which a vessel’s construction is completed.
1930
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
New Engineering & Shipbuilding Works
The port or place in which the vessel’s construction took place, at the time of writing.
Shanghai
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2411
Additional numbers that feature on a given record that may be used for identification.
No 2376; No in Register Book 3840
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
15/08/1930
Name of the individual/entity/organisation responsible for authoring the record
I O Willoughby; P Fisher King; W H Carslerg
Location where a vessel’s survey was undertaken.
Shanghai
Date of the meeting of the Classing Committee.
10/12/1930
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Amsterdam
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
1930
Pertinent, useful or interesting recorded content.
This is a British Corporation Document. Vessel has been classed by British Corporation
Name of ship as recorded on the record
Ning Kwang
The process of transferring a vessel to water, but not necessarily her completion.
02/07/1930
Unique identifier for a given ship, it is assigned by a builder.
665
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Shi
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
British Corporation for the Survey & Registry of Shipping Report of Machinery
The port in which a vessel is registered or permanently based.
Shanghai
The date of first visit by a surveyor.
20/10/1929
The individual and/or organisation listed
Asiatic Petroleum Co (N C) Ltd
Location where the document is written.
Shanghai
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
MBS Asterisk
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Internal Combustion Oil Engines Type 4-B-4 OR
N V Kromhout Motorenfabriek
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
26
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.