Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

11/06/1959

The year in which a vessel’s construction is completed.

Year of ship completion

1959

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

A B Gavle Varv

Unique identifier for a given ship, it is assigned by a builder.

Yard no

100

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Skm

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

13 Report on Electrical Equipment

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

28/04/1959

Name of the individual/entity/organisation responsible for authoring the record

Document author

K Eriksson

Location where a vessel’s survey was undertaken.

Location of Survey

Gavle

Date of the meeting of the Classing Committee.

Date of Classing committee

24/07/1959

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1959

Physical extent of a record.

Number of parts

2

Name of ship as recorded on the record

Ship name

Aldan

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

23/08/1959

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

Maschinenfabrik Augsburg Nurnberg A G

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Gavle

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

12047

The listed port to which a given vessel belongs.

Port belonging to

Leningrad

The date of first visit by a surveyor.

Date of first survey

13/01/1959

The individual and/or organisation listed

Ship owner

U S S R

Location where the document is written.

Location of Document Creation

Stockholm

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Rpt 1

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Twin Screw Motor Vessel

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

1500

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1959

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to Vessel Pamir