Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/10/1923
The year in which a vessel’s construction is completed.
1913
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
L Smit & Son
A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).
135211
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
London
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
I 3/3; D 1,1; Bureau Veritas
A vessel’s means of propulsion.
Non-propelled
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Gadsden
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1913
The port or place in which the vessel’s construction took place, at the time of writing.
Kinderdijk
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
British Corporation for the Survey & Registry of Shipping Survey for Freeboard of Sailing Ship L L 6
Name of the individual/entity/organisation responsible for authoring the record
P B Winstanley
Location where a vessel’s survey was undertaken.
London
Broad categories and subdivisions of vessels related to their purpose or function.
Dredger
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
273
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
This is a British Corporation Document. Vessel has been classed by British Corporation
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.