Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

27/06/1917

The year in which a vessel’s construction is completed.

Year of ship completion

1918

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Hanlon Dry Dock & Shipbuilding Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Oakland California

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

San Francisco 2850; San Francisco 2861

Name of the individual/entity/organisation responsible for authoring the record

Document author

Esplen Sons & McNaught Inc

A vessel’s means of propulsion.

Propulsion

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to Vessel Major Wheeler

Name of ship as recorded on the record

Ship name

Governor John Lind

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

18/05/1918

Unique identifier for a given ship, it is assigned by a builder.

Yard no

78

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Stern frame & rudder

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

Location where the document is written.

Location of Document Creation

New York

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.