Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

07/09/1955

The year in which a vessel’s construction is completed.

Year of ship completion

1955

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Mitsui Shipbuilding Co Ltd

Unique identifier for a given ship, it is assigned by a builder.

Yard no

599

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Signal letter/Call sign

JIGF

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

3177

The port in which a vessel is registered or permanently based.

Port of registry

Kobe, Japan

The date of first visit by a surveyor.

Date of first survey

11/11/1954

The individual and/or organisation listed

Ship owner

Meiji Kaiun KK Ltd

Location where the document is written.

Location of Document Creation

Kobe

Location where a vessel’s survey was undertaken.

Location of Survey

Tamano

Date of the meeting of the Classing Committee.

Date of Classing committee

10/02/1956

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1955

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Struck a Reef & Sank

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

27/07/1958

Draft

1955

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Title of Document has been Altered

Name of ship as recorded on the record

Ship name

Meikei Maru

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

23/06/1955

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

S Tanaka

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Tamano, Japan

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Kob

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

1 Steel Steamer or Motorship

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

07/09/1955

Name of the individual/entity/organisation responsible for authoring the record

Document author

G G Young; J Nonomura

Name of surveyor.

Surveyor

G G Young

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Carrying Vegetable Oil in Side Tanks in Machy Space; Ll A & CP; 8,55 Tim; +LMC 9,55; (With Torsional Endt); 1 WTDB; 1 Exqns DB CL

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Motor Vessel

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7614

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

The official record pronounced by the Committee

Loss or disposal

Wrecked

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Luzon Strait

Recorded information relating the specific cargo being conveyed.

Cargo

Vegetable Oil

Physical extent of a record.

Number of parts

3

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.