Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/12/1959
The year in which a vessel’s construction is completed.
1943
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Grangemouth Dockyard Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Grangemouth
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
116762
The port in which a vessel is registered or permanently based.
Newcastle
The date of first visit by a surveyor.
09/12/1959
The individual and/or organisation listed
Watergate Steam Ship Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
R P Frazer
Location where a vessel’s survey was undertaken.
North Shields
Date of the meeting of the Classing Committee.
11/02/1960
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2066
Date in which construction of a vessel’s engines were completed.
1943
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Dunston
Physical extent of a record.
1
Name of ship as recorded on the record
Queenworth
The process of transferring a vessel to water, but not necessarily her completion.
21/04/1942
Unique identifier for a given ship, it is assigned by a builder.
449
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Periodical Surveys & Repairs of Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
15/12/1959
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
R S Dagleish Ltd
Location where the document is written.
Newcastle on Tyne
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred for ES; But Assign MBS 12,59
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Reciprocating
North Eastern Marine Engineering Co (1938) Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up, Demolition Commenced
Recorded date for the vessel’s loss or disposal.
09/03/1960
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.