Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
15/09/1955
The year in which a vessel’s construction is completed.
1943
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Grangemouth Dockyard Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Grangemouth
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
36531
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 112906
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
15/09/1955
Name of the individual/entity/organisation responsible for authoring the record
William F Rogers; J McGuire; John Lundgren
Location where a vessel’s survey was undertaken.
Sunderland
Date of the meeting of the Classing Committee.
08/12/1955
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2066
Date in which construction of a vessel’s engines were completed.
1943
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Dunston
Physical extent of a record.
1
Name of ship as recorded on the record
Queenworth
The process of transferring a vessel to water, but not necessarily her completion.
21/04/1942
Unique identifier for a given ship, it is assigned by a builder.
449
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
The listed port to which a given vessel belongs.
Newcastle
The date of first visit by a surveyor.
11/07/1955
The individual and/or organisation listed
Watergate Steam Ship Co Ltd
Location where the document is written.
Sunderland
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Nwc 112906
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Newcastle
North Eastern Marine Engineering Co (1938) Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up, Demolition Commenced
Recorded date for the vessel’s loss or disposal.
09/03/1960
Pertinent, useful or interesting recorded content.
Also refers to Vessel Queenworth
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.