Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/02/1912
The year in which a vessel’s construction is completed.
1912
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Lytham Ship & Engine Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Lytham
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 674 JC
The date of first visit by a surveyor.
29/01/1912
Name of the individual/entity/organisation responsible for authoring the record
Joseph Pringle; James Carnaghan
Name of surveyor.
Joseph Pringle
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Lytham
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
1
Name of ship as recorded on the record
Ullsgarth
The process of transferring a vessel to water, but not necessarily her completion.
13/07/1912
Unique identifier for a given ship, it is assigned by a builder.
454
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
03/02/1912
Location where the document is written.
Sheffield; Liverpool
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Lytham Shipbuilding & Engineering Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking up
Pertinent, useful or interesting recorded content.
Engine Forgings No 374; Manufactured by The Hillfoot Forgint Co of Sheffield
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.