Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1936
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
11895
The listed port to which a given vessel belongs.
Belfast
The individual and/or organisation listed
Andrew Weir & Co
Location where the document is written.
Belfast
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Other FE Report
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Date in which construction of a vessel’s engines were completed.
1937
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Hong Kong
Name of ship as recorded on the record
Ernebank
The process of transferring a vessel to water, but not necessarily her completion.
17/11/1936
Unique identifier for a given ship, it is assigned by a builder.
984
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5b Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
Charles N Hunter; R Lee Annear
Location where a vessel’s survey was undertaken.
Belfast
Date of the meeting of the Classing Committee.
02/03/1937
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Belfast
Harland & Wolff Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking up at Hong Kong
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?