Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
18/06/1958
The year in which a vessel’s construction is completed.
1929
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Barclay, Curle & Co Ltd
The name of the yard where the vessel was built.
West Yard
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Tto
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
01/04/1958
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
R Scott Misener
Location where the document is written.
Toronto
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
MBS 2,58
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1940
Date in which construction of a vessel’s engines were completed.
1929
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1958
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Marine Salvage Ltd for Breaking up at Port Colborne, Ontario
1958
Name of ship as recorded on the record
C A Ansell
The process of transferring a vessel to water, but not necessarily her completion.
22/04/1929
Unique identifier for a given ship, it is assigned by a builder.
633
The port or place in which the vessel’s construction took place, at the time of writing.
Scotstoun
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
3584
The port in which a vessel is registered or permanently based.
Port Colborne
The date of first visit by a surveyor.
13/12/1957
The individual and/or organisation listed
Colonial Steamships Ltd
Name of the individual/entity/organisation responsible for authoring the record
E G White
Location where a vessel’s survey was undertaken.
Port Colborne
Date of the meeting of the Classing Committee.
17/07/1958
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Glasgow
Barclay Curle & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Port Colborne, Ontario
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.