Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
05/08/1943
The year in which a vessel’s construction is completed.
1942
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Foundation Maritime Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Pictou
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
4595A
The listed port to which a given vessel belongs.
Montreal
The date of first visit by a surveyor.
07/06/1943
The individual and/or organisation listed
Canadian Government
Name of the individual/entity/organisation responsible for authoring the record
James H Nairn; P W Wilson
Location where a vessel’s survey was undertaken.
Pictou N S
Date of the meeting of the Classing Committee.
15/10/1943
The name of the port/place of destination given.
Sydney N S
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2873
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Scuttled in Dock, burned for 2 days, attempt to raise unsuccessful
Physical extent of a record.
1
Name of ship as recorded on the record
Crescent Park
The process of transferring a vessel to water, but not necessarily her completion.
05/12/1942
Unique identifier for a given ship, it is assigned by a builder.
2
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hfx
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
09/06/1943
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Park Steam Ship Co Ltd
Location where the document is written.
Halifax N S
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; +LMC 6,43; CL
Recorded information related to a vessel’s movements.
Pictou N S; Sydney N S
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Damaged by fire
Recorded date for the vessel’s loss or disposal.
09/09/1956
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.