Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/01/1943
The year in which a vessel’s construction is completed.
1942
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Foundation Maritime Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Pictou
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
5792
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
20/01/1943
Location where the document is written.
Montreal
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Minute on Hfx F E Rpt
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Lachine P Q
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Damaged by fire
Recorded date for the vessel’s loss or disposal.
09/09/1956
Name of ship as recorded on the record
Crescent Park
The process of transferring a vessel to water, but not necessarily her completion.
05/12/1942
Unique identifier for a given ship, it is assigned by a builder.
2
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mtl
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Steam Reciprocating Engine Machinery
The date of first visit by a surveyor.
01/12/1942
Name of the individual/entity/organisation responsible for authoring the record
H G L Pilditch
Location where a vessel’s survey was undertaken.
Montreal
Date of the meeting of the Classing Committee.
12/10/1943
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion 3 Cylinder
Dominion Bridge Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Scuttled in Dock, burned for 2 days, attempt to raise unsuccessful
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.