Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Zanzibar ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
The process of transferring a vessel to water, but not necessarily her completion.
29/10/1890 ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
The port or place in which the vessel’s construction took place, at the time of writing.
West Hartlepool ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Location where a vessel’s survey was undertaken.
West Hartlepool ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Motherwell ( Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890 )
Sunderland ( Ship forgings report for Zanzibar, 10 November 1890 1890 )
West Hartlepool; Hartlepool ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
Is the steamer assisted by sail?
No ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Is machinery fitted at the aft of the vessel?
No ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hpl ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
The listed port to which a given vessel belongs.
London ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 +LMC 12.90 ( Steel steamer report for Zanzibar, 24 December 1890 1890 )
+LMC 12.90 ( Report on machinery for Zanzibar, 17 December 1890 1890 )
The name of the port/place of destination given.
Antwerp ( Steel steamer report for Zanzibar, 24 December 1890 1890 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2964 ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
1919 ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
Location of construction for a vessel’s engines.
West Hartlepool ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
Date in which construction of a vessel’s engines were completed.
1890 ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
Depth of vessel at ship’s side from the highest point of the upper deck to the lowest point of the keel.
24.8 ( Steel steamer report for Zanzibar, 24 December 1890 1890 )
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
313.80 ( Steel steamer report for Zanzibar, 24 December 1890 1890 )
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
21.15 ( Steel steamer report for Zanzibar, 24 December 1890 1890 )
The year in which a vessel’s construction is completed.
1890 ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Edward Withy & Co ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
A vessel’s means of propulsion.
Steam ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Does the vessel possess an auxiliary power source?
No ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Is electric lighting fitted to the vessel?
No ( Midship section plan for Zanzibar, 10 June 1890 1890, Profile plan for Zanzibar, 10 June 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 9 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 11 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 13 August 1890 1890, Receipt of steel plates for the boilers of Zanzibar, 16 August 1890 1890, Memo stating details of steel plates for the boiler of Zanzibar, 16 October 1890 1890, Ship forgings report for Zanzibar, 10 November 1890 1890, Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the classification of Zanzibar, 6 January 1891 1891, Letter from Edward Withy & Co to the Secretary of Lloyd's Register on the case of Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891, Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893, Particulars for record of material of boilers form for Zanzibar no date )
Name of surveyor.
Hugh Cameron ( Ship forgings report for Zanzibar, 10 November 1890 1890 )
Thomas Phillips ( Steel steamer report for Zanzibar, 24 December 1890 1890, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, forwarding letter received from Edward Withy & Co on Zanzibar, 8 January 1891 1891, Letter from Thomas Phillips, Hartlepool surveyor, to the Secretary of Lloyd's Register, requesting approved tracing of Zanzibar, 10 February 1891 1891 )
Thomas R Blackie ( Report on machinery for Zanzibar, 17 December 1890 1890, Particulars for record of material of boilers form for Zanzibar no date )
Alexander Douglas ( Letter from Alex Douglas, for the Surveyors at Hartlepool, to the Secretary of Lloyd's Register, returning the plans of Zanzibar, 10 July 1893 1893 )
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
The individual and/or organisation listed
Zanzibar Steamship Co Ltd ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
The name of the port/place from which a vessel’s voyage originated.
West Hartlepool ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
2281 ( Steel steamer report for Zanzibar, 24 December 1890 1890 )
Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).
Triple expansion, inverted, direct acting, 3 cranks, 3 cylinders ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
The country, at the time of writing, where a vessel’s engines were constructed.
United Kingdom ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
300 ( Steel steamer report for Zanzibar, 24 December 1890 1890, Report on machinery for Zanzibar, 17 December 1890 1890 )
Length of a ship along the summer load line from the vessel’s stem to the sternpost.
312.4 ( Steel steamer report for Zanzibar, 24 December 1890 1890 )
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
40.55 ( Steel steamer report for Zanzibar, 24 December 1890 1890 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.