Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Leicestershire ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909 )
Zamzam ( Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
03/06/1909 ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
403 ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909 )
P.Sd ( Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940 )
The individual and/or organisation listed
Bibby Steam Ship Co Ltd ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909 )
Societe Suisse de Navigation Maritime ( Postponed Surveys Form for Zamzam, 10th August 1936 1936 )
Societe Misr De Navigation Maritime ( Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Report of Total Loss, Casualty, &c for Zamzam, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 9,09 ( Report on Machinery for Leicestershire, 11th September 1904 1904 )
See minute on; Attached Rpt Belfast 6665 ( Report on Boilers for Leicestershire, 15th September 1904 1904 )
+100A1; Lloyd's A & Cp; +LMC 9,09 ( Steel Steamer Report for Leicestershire, 13th September 1909 1909 )
+100A1; fitt for Oil fuel; B S 1,36 ( Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936 )
B S 1,36 ( Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936 )
Deferred ( Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940 )
+100A1 11,39; SS 2nd No 3-2,34; SS No 1-38; +LMC 12,38; BS 12,40; TS 1,37 CL; Fitted for Oil fuel 10,19 AP above 150F ( Report of Total Loss, Casualty, &c for Zamzam, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
8039 ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904 )
8040 ( Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909 )
8299 ( Postponed Surveys Form for Zamzam, 10th August 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Report of Total Loss, Casualty, &c for Zamzam, Undated no date )
8093 ( Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936 )
Location of construction for a vessel’s engines.
Belfast ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Is electric lighting fitted to the vessel?
No ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
The official record pronounced by the Committee
Sunk ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
South Atlantic ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
G H Harris ( Steel Steamer Report for Leicestershire, 13th September 1909 1909 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
HPRD ( Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Arthur Wilson Bibby ( Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909 )
The year in which a vessel’s construction is completed.
1909 ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
The listed port to which a given vessel belongs.
Liverpool ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909 )
Alexandria ( Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940 )
Location where a vessel’s survey was undertaken.
Belfast ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909 )
Liverpool ( Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909 )
London ( Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936 )
Alexandria ( Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934 )
Port Said ( Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940 )
London; Alexandria ( Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936 )
Suez; Port Said ( Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936 )
A vessel’s means of propulsion.
Steam ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Is the steamer assisted by sail?
No ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Twin Screw Quadruple Expansion ( Report on Machinery for Leicestershire, 11th September 1904 1904 )
Inverted Vertical Surface Condensing Quadruple Expansion Direct Acting ( Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909 )
Date in which construction of a vessel’s engines were completed.
1909 ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936 )
Is machinery fitted at the aft of the vessel?
No ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by a Raider ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Recorded date for the vessel’s loss or disposal.
17/04/1941 ( Report on Machinery for Leicestershire, 11th September 1904 1904, Report on Boilers for Leicestershire, 15th September 1904 1904, Half Midship Section Plan for Leicestershire, June 1908 1908, Plan of Alternative Arrangement of Tween Deck Columns Leicestershire, 1908 1908, Plan of Longitudinal Elevation for Leicestershire, 19th June 1908 1908, Plan of Single Ended Main Boiler for Leicestershire, 23rd September 1908 1908, Plan of Double Ended Main Boilers for Leicestershire, 23rd September 1908 1908, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Leicestershire, 17th September 1909 1909, Steel Steamer Report for Leicestershire, 13th September 1909 1909, Form for Vessels of 100 Tons & Upwards for Leicestershire, 6th September 1909 1909, Report on Electric Lighting Installation for Leicestershire, 11th September 1909 1909, Letter from Secretary, Lloyd\'s Register, London to H Bishop, Ship & Engineer Surveyor, Lloyd\'s Register, Alexandria, regarding a request from the owners to convert some of the holds for Zamzam, 24th September 1934 1934, Memo regarding plans to convert some of the holds for Zamzam, 24th September 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to the Secretary, Lloyd\'s Register, London, regarding the owner\'s wishes to convert some of the holds for extra oil fuel & fresh water for Zamzam, 8th September 1934 1934, Copy of a letter from Societe Mist De Navigation Maritime, Ship Owners, to H Bishop, Surveyor, Lloyd\'s Register, Alexandria, regarding their wishes to convert some of the holds for Zamzam, 4th September 1934 1934, Letter from Secretary, Lloyd\'s Register, London, to H Bishop Esq, Surveyor, Lloyd\'s Register, Alexandria, regarding the enclosed plans detailing the proposed structural changes to the upper decks of Zamzam, 23rd August 1934 1934, Memo regarding structural alterations to the upper deck of Zamzam, 23rd August 1934 1934, Letter from H Bishop, Surveyor, Lloyd\'s Register, Alexandria, to Secretary, Lloyd\'s Register, London, regarding the owner\'s application to make some structural changes on the upper decks of Zamam, 18th August 1934 1934, Bridge Deck Plan for Zamzam,1934 1934, Boat Deck Plan for Zamzam, 23rd August 1934 1934, Plan showing structure of bridge deck extension for Zamzam, 23rd August 1934 1934, Half Midship Section Plan for Zamzam, 2nd September 1934 1934, Section View at G H Showing Structure of Boat Deck Plan for Zamzam,1934 1934, Profile & Deck Plan for Zam Zam, 14th August 1934 1934, Half Midship Section Plan for Zamzam, 19th August 1934 1934, Letter from Secretary, Lloyd\'s Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the conversion of the holds for Zamzam, 16th November 1935 1935, Memo to the Secretary, Lloyd\'s Register, detailing the information to be sent to the Port Said Surveyor about the conversion of certain holds for Zamzam, 15th November 1935 1935, Letter from James Macvey, Surveyor, Lloyd\'s Register, Port Said to the Secretary, Lloyd\'s Register, London, requesting advice regarding the conversion of some of the holds for Zamzam, 11th November 1935 1935, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to J MacVey, Lloyd's Register Surveyor, Port Said, regarding additional stiffening proposed to the tunnel & bulkheads for Zamzam, 7th December 1936 1936, Memo for Zamzam to state the Port Said Surveyors should still issue the certificate, 4th December 1936 1936, Letter from James MacVey, Lloyd\'s Register Surveyor, Port Said, to the Secretary, Lloyd\'s Register, London, regarding the stiffening of the bulkheads & tunnels for Zamzam, 19th November 1936 1936, Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to H Bishop, Lloyd\'s Register Surveyor, Alexandria, regarding the owners wishes to postpone the Screwshaft Survey for Zamzam, 11th August 1936 1936, Postponed Surveys Form for Zamzam, 10th August 1936 1936, Question & Answer Memo between London & Alexandria Office regarding Screwhaft Survey for Zamzam, 23rd July 1936 1936, Extract from Letter dated 20th March 1936 from Port Said Surveyors, regarding Electrical Fittings & Wiring for Zamzam 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the chain cable for Zamzam, 3rd March 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Surveyor, Lloyd\'s Register, Port Said, regarding the stiffening arranged for the vessel & the issuing of a certificate for Zamzam, 30th January 1936 1936, Memo for Zamzam regarding the arranged stiffening to be fitted in hold number 5, 30th January 1936 1936, Letter from James Macvey, Lloyd\'s Shipping Surveyor, Port Said, to The Secretary, Lloyd's Register, London, regarding the postponed stiffening of the bulkheads for Zamzam, 21st January 1936 1936, Letter from Secretary, Lloyd's Register, London to J Macvey, Lloyd\'s Register Surveyor, Port Said, regarding a telegram about the required stiffening for Zamzam, 16th January 1936 1936, Memo regarding the information to be cabled to the Port Said surveyor about the stiffening of the bulkheads for Zamzam, 16th January 1936 1936, Letter from Lloyd\'s Register, Port Said, regarding Zamzam, 9th January 1936 1936, Report of Survey for Repairs, &c for Zamzam, 6th February 1936 1936, Certificate of Survey of Repairs for Zamzam, 28th January 1936 1936, Certificate of Boilers for Zamzam, 28th January 1936 1936, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of the boilers for Zamzam, 6th March 1936 1936, Report of Survey for Repairs, &c, of Engines & Boilers for Zamzam, 4th February 1936 1936, Certificate of Survey of Damage for Zamzam, 31st December 1940 1940, Certificate of Survey of Repairs for Zamzam, 30th December 1940 1940, Report of Survey for Repairs, &c for Zamzam, 31st December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Zamzam, 13th March 1941 1941, Report of Total Loss, Casualty, &c for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date, Plan of Bulkhead for Zamzam, Undated no date )
Physical arrangement of a ship’s masts, sails and rigging.
The port in which a vessel is registered or permanently based.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.