Name of ship as recorded on the record

Ship name

Saba ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912 )

Settler ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912 )

Yvonne ( Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

15/06/1912 ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

427 ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Location where a vessel’s survey was undertaken.

Location of Survey

South Shields ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911 )

South Shields; Newcastle on Tyne ( Steel Steamer Report for Saba, August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912 )

London ( Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934 )

Newcastle on Tyne ( Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912 )

Leith ( Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934 )

Alexandria ( Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934 )

undefined ( Memo for Saba, 21st August 1912 1912, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking Up Purposes ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Recorded information related to a vessel’s movements.

Physical arrangement of a ship’s masts, sails and rigging.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion Direct Acting Inverted Cylinders ( Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912 )

Triple Expansion Surface Condensing ( Report on Machinery for Saba, 14th August 1912 1912 )

The year in which a vessel’s construction is completed.

Year of ship completion

1912 ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Readhead & Sons Ltd ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

South Shields ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Screw Steamer ( Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

The official record pronounced by the Committee

Loss or disposal

Broken up ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000 ( Plan of Steel Boilers for Saba, 3rd October 1911 1911, Plan of Donkey Boiler for Saba, 3rd October 1911 1911, Midship Section Plan for Saba, 1911 1911, Profile & Deck Plan for Saba, 1911 1911, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Settler, 21st August 1912 1912, Steel Steamer Report for Saba, August 1912 1912, Form for Vessels of 100 Tons & Upwards for Saba, 9th August 1912 1912, Report on Machinery for Saba, 14th August 1912 1912, Letter from John Houston, to the Secretary Lloyd's Register, London, regarding Saba, 22nd August 1912 1912, Copy of Letter from Assistant to the Secretary, to the Surveyors, Newcastle on Tyne, regarding Saba, 21st August 1912 1912, Memo for Saba, 21st August 1912 1912, Report on Boilers for Saba, 14th August 1912 1912, Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 17th December 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Yvonne, 24th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Yvonne, 22nd November 1934 1934, Memo for Yvonne, 21st November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to The Bristol Channel & Levant Lines Ltd, London, regarding Yvonne, 8th November 1934 1934, Copy of Letter from Clerk to the Classification Committee, to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Copy of Letter to the Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 18th September 1934 1934, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Yvonne, 15th September 1934 1934, Certificate of Survey of Port Boiler for Yvonne, 23rd August 1934 1934, Copy of Letter from H Bishop, Engineer Surveyor to Lloyd's Register, to Bristol Channel & Levant Line Ltd, London, regarding Yvonne, 23rd August 1934 1934, Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Lloyds A & Cp; +LMC 8,72 ( Steel Steamer Report for Saba, August 1912 1912 )

+LMC 8,12 ( Report on Machinery for Saba, 14th August 1912 1912 )

See Minute on Nwc Rpt 62855 Attached ( Report on Boilers for Saba, 14th August 1912 1912 )

+100A1 9,33; SS Liv No 3-8,24; SS Pir No 2,33; +LMC; MS 2,32; BS 3,34 ( Report of Total Loss, Casualty, &c for Yvonne, 20th December 1934 1934 )

+100A1 Pir 9,33; SS Liv No 3-8,24; SS Pir No 2-33; +LMC; MS 2-32; BS 3,34; TS-2,32 CL ( Report of Survey for Repairs, &c, of Engines & Boilers for Yvonne, 29th August 1934 1934 )

The name of the port/place of destination given.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.