Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
William Miskin ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1852 ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
The port or place in which the vessel’s construction took place, at the time of writing.
Hull ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
The listed port to which a given vessel belongs.
London ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
George Noel ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Location where a vessel’s survey was undertaken.
London ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Recorded information related to a vessel’s movements.
London; Melbourne; Port Philip ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
125 ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Is machinery fitted at the aft of the vessel?
No ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
The year in which a vessel’s construction is completed.
1852 ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J & W Pim ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
The individual and/or organisation listed
Pegler & Co ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Name of surveyor.
James Martin ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 Built of Iron ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
The name of the port/place of destination given.
Melbourne; Port Philip ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
A vessel’s means of propulsion.
Sail ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Is the steamer assisted by sail?
No ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Does the vessel possess an auxiliary power source?
No ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Is electric lighting fitted to the vessel?
No ( Iron Ships Report for William Miskin, 2nd April 1853 1853 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.