Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Westpool ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
21/09/1918 ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
20 ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Location where a vessel’s survey was undertaken.
Seattle Wash ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918 )
Seattle ( Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919 )
Seattle U S A ( Plan of Main Boilers for Westpool, 22nd April 1918 1918 )
Newport News ( Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940 )
Baltimore ( Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941 )
Baltimore, Maryland ( Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941 )
A vessel’s means of propulsion.
undefined ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941 )
Steam ( Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Is the steamer assisted by sail?
No ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Recorded date for the vessel’s loss or disposal.
03/04/1941 ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sea ( Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918 )
Bal ( Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941 )
The individual and/or organisation listed
The United States of America ( Steel Steamer Report for Westpool, 13th November 1918 1918 )
United States Shipping Board Emergency Fleet Corp ( Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918 )
British Ministry of Shipping ( Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; LMC 11,18; A & CP Elec Lt ( Steel Steamer Report for Westpool, 13th November 1918 1918 )
LMC 11,18 ( Report on Machinery for Westpool, 30th November 1918 1918 )
Elec Light ( Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918 )
+100A1; S S Bal 2nd No3-3,41; +LMC 3,41; TS 1,41 ( Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941 )
+LMC 3,41; TS 1,41 ( Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941 )
+2,21 ( Report of Total Loss, Casualty, &c for Westpool, Undated no date )
The name of the port/place of destination given.
France ( Steel Steamer Report for Westpool, 13th November 1918 1918 )
Halifax; Leith ( Report of Total Loss, Casualty, &c for Westpool, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Westpool, 30th November 1918 1918 )
Date in which construction of a vessel’s engines were completed.
The port in which a vessel is registered or permanently based.
London ( Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941 )
The year in which a vessel’s construction is completed.
1918 ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J F Duthie & Co ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
J. F. Duthie & Co ( Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941 )
The port or place in which the vessel’s construction took place, at the time of writing.
Seattle ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Screw Steamer ( Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Is electric lighting fitted to the vessel?
No ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
The official record pronounced by the Committee
Sunk ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Halifax; Leith ( Half Midship Section Plan for Westpool, 22nd December 1917 1917, Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918, Plan of Main Boilers for Westpool, 22nd April 1918 1918, Steel Decks Plan for Westpool, 1918 1918, Inboard Profile & Deck Plan for Westpool, 1918 1918, Letter from R P Hutchinson, New York Surveyor, to A Scott Esq, Secretary of Lloyd's Register London, regarding lifeboats & pump for Westpool, 26th February 1919 1919, Letter from W S P Collings, Seattle Surveyor, to The Secretary of Lloyd's Register New York, regarding omissions from report for Westpool, 20th February 1919 1919, Memo to the Chief Ship Surveyor regarding the anchor for Westpool, 8th January 1919 1919, Memo regarding omissions of nuts & bolts from report for Westpool, 8th January 1919 1919, Report on Masts, Spars, & Rigging for Westpool, 4th October 1940 1940, Letter from Pro Secretary to The Ministry of Shipping, Blackpool, regarding fees for reclassification survey for Black Osprey, 9th July 1941 1941, Memo regarding fees for reclassification survey for Westpool, 24th June 1941 1941, Memo to the Chief Ship Surveyor regarding the 2nd SS no 3 for reclassification of Westpool, 21st June 1941 1941, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Memo regarding fee for Westpool, 20th June 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date, Thickness of Plating Form for Westpool, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
LNKT ( Steel Steamer Report for Westpool, 13th November 1918 1918 )
The listed port to which a given vessel belongs.
Seattle ( Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report on Electric Lighting Installation for Westpool, 2nd November 1918 1918 )
London ( Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
United States Shipping Board Emergency Fleet Corp ( Steel Steamer Report for Westpool, 13th November 1918 1918 )
Mungo Campbell & Co Ltd ( Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941 )
Recorded information related to a vessel’s movements.
Seattle; Washington; France ( Steel Steamer Report for Westpool, 13th November 1918 1918 )
Halifax; Leith ( Report of Total Loss, Casualty, &c for Westpool, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5724 ( Steel Steamer Report for Westpool, 13th November 1918 1918, Report on Machinery for Westpool, 30th November 1918 1918, Report of Survey for Repairs, &c for Westpool, 12th April 1941 1941, Certificate of Testing for Westpool, 21st February 1941 1941, Certificate of Survey of Repairs for Westpool, 21st February 1941 1941, Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941, Report of Total Loss, Casualty, &c for Westpool, Undated no date )
Location of construction for a vessel’s engines.
Los Angeles ( Report on Machinery for Westpool, 30th November 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for Westpool, 12th April 1941 1941 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Certificate of Survey of Boilers & Machinery for Westpool, 21st February 1941 1941 )
The name of the port/place from which a vessel’s voyage originated.
Halifax ( Report of Total Loss, Casualty, &c for Westpool, Undated no date )
Have you noticed missing or incorrect data or images for this ship?