Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Wellfield ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Well Field ( Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941 )
The process of transferring a vessel to water, but not necessarily her completion.
08/12/1923 ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Unique identifier for a given ship, it is assigned by a builder.
225 ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Location where a vessel’s survey was undertaken.
Newcastle ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924 )
Willington Quay ( Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921 )
Wallsend-on-Tyne ( Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Steam Donkey Boiler Plan for Wellfield, undated no date )
Newcastle on Tyne ( Report on Electric Fittings for Wellfield, 29th February 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date )
Newcastle-on-Tyne ( Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941 )
Newcastle; Newcastle on Tyne ( Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924 )
London ( Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931 )
Sunderland ( Ship Forgings Form for Wellfield, 25th November 1931 1931 )
Grimsby ( Engine Forgings Form for Wellfield, 1931 1931 )
North Shields; Newcastle on Tyne ( Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932 )
North Shields; Wallsend; Newcastle on Tyne ( Report on Electric Fittings for Wellfield, 21st January 1932 1932 )
Wokingham ( Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941 )
New York ( Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941 )
Bethlehem; New York ( Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5740 ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921 )
5633 ( Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924 )
6054 ( Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Enemy Action ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc ( Report on Electric Fittings for Wellfield, 29th February 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932 )
N.Yk ( Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Hunting & Son ( Steel Steamer Report for Wellfield, 14th March 1924 1924 )
Percy Llewellyn Hunting ( Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924 )
Hunting & Son Ltd ( Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date )
Recorded information related to a vessel’s movements.
Newcastle on Tyne; New Orleans ( Steel Steamer Report for Wellfield, 14th March 1924 1924 )
Recorded information relating the specific cargo being conveyed.
The port in which a vessel is registered or permanently based.
Newcastle ( Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924 )
Location of construction for a vessel’s engines.
Wallsend on Tyne ( Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924 )
Newcastle ( Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941 )
Name of surveyor.
Maurice Ritson ( Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924 )
William Butler ( Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932 )
The year in which a vessel’s construction is completed.
1924 ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Tyne Iron Shipbuilding Co ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
The name of the yard where the vessel was built.
Willington Quay ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
The individual and/or organisation listed
Hunting & Son ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921 )
Northern Petroleum Tanks Steamship Co Ltd ( Report on Electric Fittings for Wellfield, 29th February 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924 )
The Field Tanks Steamship Co Ltd ( Steel Steamer Report for Wellfield, 14th March 1924 1924 )
Field Tank Steamship Co Ltd ( Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Report of Total Loss, Casualty, &c for Wellfield, Undated no date )
Field Tanks Steamship Co Ltd ( Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941 )
A vessel’s means of propulsion.
Motor (internal combustion) ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Steam Donkey Boiler Plan for Wellfield, undated no date )
Steam ( Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Steel Steamer Report for Wellfield, 14th March 1924 1924, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932 )
undefined ( Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date )
Is the steamer assisted by sail?
No ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Does the vessel possess an auxiliary power source?
No ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Is electric lighting fitted to the vessel?
No ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
The official record pronounced by the Committee
Sunk (war loss) ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
Recorded date for the vessel’s loss or disposal.
12/06/1941 ( Request for Special Survey of Boilers & Engines of Wellfield, 13th September 1921 1921, Midship Section & Transverse Oiltight Bulkhead plan for Wellfield, 6th January 1921 1921, Profile & Deck Plans for Wellfield, 22nd February 1921 1921, Crankshaft Plan for Wellfield, 20th Jan 1922 1922, Report on Electric Fittings for Wellfield, 29th February 1924 1924, Letter from S J Robson, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, referring to classing letter stating oil tight bulkhead is carried to upper deck & not only to 2nd deck as on approved plan for Wellfield, 22nd March 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Wellfield, 17th March 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Memo submitting eligibility for The Record with notation for machinery, oil engines with particulars for Wellfield, 19th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter returning approved plan showing proposed poop front stiffening for Wellfield, 11th December 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning plan of proposed poop front stiffening stating approval for arrangements as shown to meet requirements of Load Line Convention for Wellfield, 10th December 1931 1931, Memo regarding Plan of poop stiffening to meet requirements of Load Line Convention, submitting informing Firm of approval for arrangements as shown on plan to meet Convention requirements, welding of horizontal stiffener for Wellfield, 10th December 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, to Secretary of Lloyd's Register, London, submitting plan of poop front & requesting if stiffening will meet requirements of Load Line Convention for Wellfield, 9th December 1931 1931, Letter from Curchin & Watson to The Secretary, Lloyd's Register, regarding steel hatch cover for Wellfield, 17th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to The Surveyors at Newcastle on Tyne, regarding plan of steel hatch cover for Wellfield, 16th October 1931 1931, Copy of letter from the Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding plans for Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, submitting for consideration an alternative plan of steel hatch cover to be fitted to Wellfield, 16th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, acknowledging letter approving plan of steel hatch cover & noting its contents for Wellfield, 14th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, returning approved plan of hatch cover for use of Owners & copy to be forwarded for local Surveyors' guidance for Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing for information a copy of letter regarding approval of plan of hatch cover & copy of plan itself for Wellfield, 13th October 1931 1931, Letter from Curchin & Watson, Naval Architects & Engineers, London, to Secretary of Lloyd's Register, London, regarding approved plan of hatch cover, enclosing a copy for Surveyors & requesting a stamped copy for Owners of Wellfield, 13th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, regarding handed in plan of proposed hatch cover stating approval for arrangements as shown & to Surveyor satisfaction for Wellfield, 12th October 1931 1931, Memo regarding Plan of hatch cover to forward hold, submitting informing of approval for scantlings & arrangements as shown & to Surveyor satisfaction, request additional copy for use of Surveyors for Wellfield, 12th October 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors regarding proposal to lengthen vessel, informing of scantlings already in accordance with rules for proposed increase in length for Wellfield, 27th August 1931 1931, Letter from Newcastle-on-Tyne Surveyors per S R Davies to Secretary of Lloyd's Register, London, requesting copies of plans of lengthening arrangements stated to have been submitted to & approved by Committee for Wellfield, 26th August 1931 1931, Letter from Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & taking opportunity to lengthen vessel in accordance with approved plans & works for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plan showing method of attaching balance weights to existing main engine crankshafts stating approval for arrangements as shown for Wellfield, 6th August 1931 1931, Memo regarding approval of plan for Wellfield, 6th August 1931 1931, Letter from William Butler, Newcastle-on-Tyne Surveyor, to Secretary of Lloyd's Register, London, submitting for consideration of Committee plan showing balance weights proposed for main engine crank shafts of Wellfield, 5th August 1931 1931, Letter from Curchin & Watson to the Secretary of Lloyd's Register, London, regarding proposed change to length of Wellfield, 29th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors returning plans of midship seciton & profile & enclosing copy of letter regarding proposal to lengthen Wellfield, 28th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Curchin & Watson, London, advising already approved scantlings in accordance with Rules for increased length proposed with 3rd bower anchor replacement & additional cable for Wellfield, 28th July 1931 1931, Memo regarding Owners proposing to increase length of vessel, scantlings as already approved in accordance with Rules for proposed increase in length, requirement of replacement 3rd bower anchor & additional length of cable for Wellfield, 27th July 1931 1931, Memo regarding proposal to increase length of vessel, submitting informing of stated increase in Summer freeboard with increased trunk for Wellfield, 28th July 1931 1931, Letter from Curchin & Watson, Architects & Engineers, London, to Secretary of Lloyd's Register, London, advising of Owners considering increasing length by adding one tank, requesting if additional scantlings required for Wellfield, 24th July 1931 1931, Letter from Newcastle-on-Tyne Surveyors per L Storey to Secretary of Lloyd's Register, London, returning requested plans of midship section & profile of Wellfield, 24th July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors confirming despatched telegram requesting return for reference plans of midship section & profile for Wellfield, 23rd July 1931 1931, Letter from Secretary of Lloyd's Register, London, to Newcastle-on-Tyne Surveyors enclosing letter from Managers regarding repairs & alterations to be carried out to Wellfield, 17th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, noting contents of letter regarding alterations to be carried out & communicating with local Surveyors on details of work for Wellfield, 17th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, informing of contract for hull repairs & opportunity to lengthen vessel with approved plans for Wellfield, 14th August 1931 1931, Letter from Secretary of Lloyd's Register, London, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, regarding repairs & noting proposal to carry out Special Survey No 2, confirming approval of plans for proposed lengthening of Wellfield, 5th August 1931 1931, Memo regarding Owners taking opportunity to carry out Special Survey No 2 whilst repairs in progress which is in order, plans submitted for lengthening of vessel approved & noting that lengthening not definitely decided for Wellfield, 5th August 1931 1931, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, London, regarding proposal to carry out 2nd classification survey whilst repairs in progress for Wellfield, 4th August 1931 1931, Ship Forgings Form for Wellfield, 25th November 1931 1931, Engine Forgings Form for Wellfield, 1931 1931, Plan of Poop Front Stiffening for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover for Wellfield, 1931 1931, Plan of Fore Hold Hatch Cover, Stiffened Athwartships, for Wellfield, 1931 1931, Plan of Balance Weights for Main Crank Shaft for Wellfield, 4th August 1931 1931, Memo from the Chief Ship Surveyor to the Classing Committee regarding examination & repairs to Wellfield, 2nd February 1932 1932, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Certificate of Survey of Damage for Well Field, 28th April 1932 1932, Memo from the Chief Engineer Surveyor to the Classing Committee regarding damage & wear & tear to Wellfield, 5th February 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, explaining scale of charges in relation to partial Special Survey No 1 in New York for Wellfied, 15th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Secretary of Lloyd's Register, Wokingham, requesting clarification on part Special No 1 Survey fees to be charged for Wellfield, 10th December 1941 1941, Letter from Clerk of Classification Committee of Lloyd's Register to Hunting & Son Ltd, Newcastle-on-Tyne, Managers, responding to enquiry on scale of fees in US informing of fees for surveys outside of UK based as at port for Wellfied, 8th December 1941 1941, Letter from John N Hendry, Marine Supt of Hunting & Son Ltd, Newcastle-on-Tyne, Managers, to Lloyd's Register, Wokingham, requesting scale of fees current in United States in relation to special No 1 survey in New York for Wellfield, 3rd December 1941 1941, Memo for Chief Ship Surveyor regarding New York Report on 2nd No 1 Survey Partly Held, subject to to specified plat being examined at next dry docking, stated length of chain cable required to be supplied for Wellfield, 24th July 1941 1941, Report on Masts, Spars & Rigging for Wellfield, 19th March 1941 1941, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Certificate of Survey of Repairs for Well Field, 1st April 1941 1941, Certificate of Survey of Donkey Boilers & Machinery for Well Field, 1st April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941, Report of Total Loss, Casualty, &c for Wellfield, Undated no date, Copy of Telegram from the Newcastle office to the Committee requesting return of plans for Wellfield, Undated no date, Note regarding metallic packing for Wellfield, Undated no date, Calculations regarding Wellfield, Undated no date, Steam Donkey Boiler Plan for Wellfield, undated no date )
The listed port to which a given vessel belongs.
Newcastle ( Report on Electric Fittings for Wellfield, 29th February 1924 1924, Steel Steamer Report for Wellfield, 14th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report on Electric Fittings for Wellfield, 21st January 1932 1932, Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Carrying Petroleum in bulk; Lloyds A&CP; +LMC 3,24 Oil Engines; CL ( Steel Steamer Report for Wellfield, 14th March 1924 1924 )
+LMC 3,24; Oil engines; CL ( Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924 )
+100A1; S S No 2,32; Len 1,32 +LMC; Amend Notation of BH; S1-32 ( Report of Survey for Repairs, &c for Wellfield, 23rd January 1932 1932 )
+LMC 1-32; D B S 1-32; S 1-32 without spl Condn ( Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932 )
See Minute on Other Report Newcastle 87999 ( Report on Electric Fittings for Wellfield, 21st January 1932 1932 )
Deferred for Completion; S S 2nd No1; D B S 3,41; TS 3,41; Subject ( Report of Survey for Repairs, &c for Wellfield, 22nd May 1941 1941 )
Deferred for Completion; LMC CS; D B S 3,41; TS 3,41 ( Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941 )
+100A1 6,40; S S No 3-36; +LMC 8,36; DB S 11,39; TS 11,38 CL; Oil Engines; Carrying Petrolum in Bulk ( Report of Total Loss, Casualty, &c for Wellfield, Undated no date )
The name of the port/place of destination given.
New Orleans ( Steel Steamer Report for Wellfield, 14th March 1924 1924 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KQGF ( Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Nils M Nielson ( Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924 )
Type and configuration of the engine(s) supplied for a vessel.
Motor Reciprocating Internal Combustion Vertical Direct Acting Donkey ( Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924 )
Date in which construction of a vessel’s engines were completed.
1924 ( Form for Vessels of 100 Tons & Upwards for Wellfield, 11th March 1924 1924, Report on Oil Engine Machinery for Wellfield, 4th March 1924 1924, Report on Boilers for Wellfield, 4th March 1924 1924, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 7th January 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Wellfield, 22nd May 1941 1941 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.