Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Liv ( Survey Report for Wave, January 1839 1839 )
Lon ( Survey Report for Wave, 2nd April 1839 1839, Survey Report for Wave, 11th September 1840 1840 )
The individual and/or organisation listed
J B Blarke & Co ( Survey Report for Wave, January 1839 1839 )
Prigsley & Co ( Survey Report for Wave, 2nd April 1839 1839 )
R R Brown ( Survey Report for Wave, 11th September 1840 1840 )
Location where a vessel’s survey was undertaken.
Liverpool ( Survey Report for Wave, January 1839 1839 )
London ( Survey Report for Wave, 2nd April 1839 1839, Survey Report for Wave, 11th September 1840 1840 )
Recorded information related to a vessel’s movements.
Liverpool; New Orleans ( Survey Report for Wave, January 1839 1839 )
London; Liverpool ( Survey Report for Wave, 2nd April 1839 1839 )
London; Sandwich Islands ( Survey Report for Wave, 11th September 1840 1840 )
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque ( Survey Report for Wave, January 1839 1839 )
Sr - Schooner ( Survey Report for Wave, 2nd April 1839 1839 )
Bg - Brig ( Survey Report for Wave, 11th September 1840 1840 )
Predominant material(s) utilised in a vessel’s construction.
Wood ( Survey Report for Wave, January 1839 1839, Survey Report for Wave, 2nd April 1839 1839, Survey Report for Wave, 11th September 1840 1840 )
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Survey Report for Wave, January 1839 1839, Survey Report for Wave, 2nd April 1839 1839, Survey Report for Wave, 11th September 1840 1840 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
Name of surveyor.
Nathaniel Middleton ( Survey Report for Wave, 2nd April 1839 1839 )
Nathaniel G Clark ( Survey Report for Wave, 11th September 1840 1840 )
The year in which a vessel’s construction is completed.
1838 ( Survey Report for Wave, January 1839 1839, Survey Report for Wave, 2nd April 1839 1839, Survey Report for Wave, 11th September 1840 1840 )
The port or place in which the vessel’s construction took place, at the time of writing.
The listed port to which a given vessel belongs.
Liverpool ( Survey Report for Wave, January 1839 1839 )
Bideford ( Survey Report for Wave, 2nd April 1839 1839 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Blandford ( Survey Report for Wave, January 1839 1839 )
Pugsley ( Survey Report for Wave, 2nd April 1839 1839 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A2 for 4 Years ( Survey Report for Wave, January 1839 1839 )
A1 for 4 years ( Survey Report for Wave, 2nd April 1839 1839 )
The name of the port/place of destination given.
New Orleans ( Survey Report for Wave, January 1839 1839 )
Liverpool ( Survey Report for Wave, 2nd April 1839 1839 )
Sandwich Islands ( Survey Report for Wave, 11th September 1840 1840 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Survey Report for Wave, January 1839 1839, Survey Report for Wave, 2nd April 1839 1839, Survey Report for Wave, 11th September 1840 1840 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.