Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The process of transferring a vessel to water, but not necessarily her completion.

The port or place in which the vessel’s construction took place, at the time of writing.

The listed port to which a given vessel belongs.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Location where a vessel’s survey was undertaken.

The name of the port/place of destination given.

Destined voyage

Cape of Good Hope ( Survey Report for Waterlily, 3rd August 1860 1860 )

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

218 ( Survey Report for Waterlily, 3rd August 1860 1860 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

The year in which a vessel’s construction is completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Abbreviations of the names of ports with Lloyd’s Register survey offices.

The individual and/or organisation listed

Name of surveyor.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Physical arrangement of a ship’s masts, sails and rigging.

Predominant material(s) utilised in a vessel’s construction.

System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.

Gross Register Tonnage (OM)

268 ( Survey Report for Waterlily, 3rd August 1860 1860 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Broad categories and subdivisions of vessels related to their purpose or function.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.