The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

13/05/1895 ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

213 ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

West Hartlepool ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895 )

Stockton-on-Tees ( Plan of Boiler for Verbena, 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894 )

Sunderland ( Ship Forgings Form for Verbena, 12th December 1894 1894 )

Leeds; Hartlepool ( Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894 )

Spennymoor ( Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894 )

Hartlepool ( Plan of Boilers for Verbena, 13th July 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895 )

West Hartlepool; Hartlepool ( Steel Steamer Report for Verbena, 23rd April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

The listed port to which a given vessel belongs.

Recorded information related to a vessel’s movements.

Voyage information

West Hartlepool; River Plate ( Steel Steamer Report for Verbena, 23rd April 1895 1895 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Location of construction for a vessel’s engines.

Location of engine build

Hartlepool ( Report on Machinery for Verbena, 20th April 1895 1895 )

The port in which a vessel is registered or permanently based.

The year in which a vessel’s construction is completed.

Year of ship completion

1895 ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Furness Withy & Co ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

West Hartlepool ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date )

undefined ( Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Press Copy of Note regarding materials for Verbena, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Sketch of Section of Framing for Verbena, 10th July 1893 1893, Plan of Half Midship Section for Verbena, 10th July 1894 1894, Plan of Boiler for Verbena, 1894 1894, Ship Forgings Form for Verbena, 12th December 1894 1894, Copy of consignment note from Leeds Forge Co to Richardson & Sons Ltd regarding boilers for Verbena, 30th November 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 18th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 16th October 1894 1894, Surveyors Advice of Tests of Steel for Verbena, 6th October 1894 1894, Plan of Boilers for Verbena, 13th July 1894 1894, Profile Plan for Verbena, 9th July 1894 1894, Plan of Pumping Arrangement for Verbena, 10th December 1894 1894, Sketch of Iron Lower Masts for Verbena, 1894 1894, Plan of Sketch Shewing Proposed Method of Fitting Stern Tube for Verbena, 24th September 1894 1894, Press Copy of a Steel Test Certificate for test on Verbena, undertaken by Frank L Sturgeon, 20th February 1895 1895, Form from Charles Fowling, for the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Verbena, 16th April 1895 1895, Steel Steamer Report for Verbena, 23rd April 1895 1895, Freeboard Verification Form for Steamers for Verbena, 11th April 1895 1895, Report on Machinery for Verbena, 20th April 1895 1895, Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895, Envelope containing Boiler Forms for Verbena, Undated no date, Press Copy of Note regarding materials for Verbena, Undated no date )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion ( Report on Machinery for Verbena, 20th April 1895 1895 )

Compound Triple Expansion Direct Acting Inverted Cylinders Surface ( Form for Vessels of 100 Tons & Upwards for Verbena, 19th April 1895 1895 )

Date in which construction of a vessel’s engines were completed.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.