Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Val de Travers ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Ship Forgings Form for Val de Travers, Undated no date )
Val de Travers; Anubis ( Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900 )
Anubis ( Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925 )
The process of transferring a vessel to water, but not necessarily her completion.
16/12/1999 ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
58 ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Location where a vessel’s survey was undertaken.
Ayr ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899 )
Glasgow ( Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Ayr; Glasgow ( Steel Steamer Report for Val de Travers, 1st February 1900 1900 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Is electric lighting fitted to the vessel?
No ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Name of surveyor.
Frank Cook ( Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899 )
William R Austin ( Report on Machinery for Val de Travers, 29th January 1900 1900 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel well Dk; 1Dk Iron; A & CP ( Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900 )
+100A1 (Stl); A & CP +LMC 1,00 ( Steel Steamer Report for Val de Travers, 1st February 1900 1900 )
+LMC 1,00 ( Report on Machinery for Val de Travers, 29th January 1900 1900 )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
The name of the port/place of destination given.
Coasting ( Steel Steamer Report for Val de Travers, 1st February 1900 1900 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting Inverted ( Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900 )
Triple Expansion ( Report on Machinery for Val de Travers, 29th January 1900 1900 )
The year in which a vessel’s construction is completed.
1899 ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
S McKnight & Co Ltd ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Ayr ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
A vessel’s means of propulsion.
Steam ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Ship Forgings Form for Val de Travers, Undated no date )
undefined ( Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925 )
Is the steamer assisted by sail?
No ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Longitudinal Section & Deck Plan for Val de Travers, 30th March 1899 1899, Midship Section Plan for Val de Travers, 30th March 1899 1899, Plan of Sketch Shewing Arrangement for Val de Travers, 30th March 1899 1899, Plan of Pumping Arrangement for Val de Travers, 24th June 1899 1899, Plan of Boiler for Val de Travers, 1899 1899, Ship Forgings Form for Val de Travers, 1899 1899, Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Plan of Rudder & Stern Frame for Val de Travers, 30th March 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding classification of Val de Travers, now Anubis, 6th February 1900 1900, Steel Steamer Report for Val de Travers, 1st February 1900 1900, Form of Forwarding Midship Section Tracing from R N Ayton, pro the Surveyors to the Secretary, Lloyd's Register, London, forwarding Midship Section for Val de Travers, 29th January 1900 1900, Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900, Cover note for Nantes Report 1406 regarding Anubis, 17th March 1925 1925, Ship Forgings Form for Val de Travers, Undated no date )
Location of construction for a vessel’s engines.
Glasgow ( Engine Forgings Form for Val de Travers, 22nd September 1899 1899, Engine Forgings Form for Val de Travers, 15th May 1899 1899, Report on Machinery for Val de Travers, 29th January 1900 1900 )
Govan ( Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Val de Travers, 1st February 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900 )
The individual and/or organisation listed
John Harrison ( Steel Steamer Report for Val de Travers, 1st February 1900 1900, Report on Machinery for Val de Travers, 29th January 1900 1900 )
John Thomas Harrison ( Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900 )
Recorded information related to a vessel’s movements.
Ayr; Glasgow; Coasting ( Steel Steamer Report for Val de Travers, 1st February 1900 1900 )
Physical arrangement of a ship’s masts, sails and rigging.
The port in which a vessel is registered or permanently based.
Glasgow ( Form for Vessels of 100 Tons & Upwards for Val de Travers, 29th January 1900 1900 )
Date in which construction of a vessel’s engines were completed.
Have you noticed missing or incorrect data or images for this ship?