Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Usworth ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/08/1869 ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Newcastle ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

The listed port to which a given vessel belongs.

Location where a vessel’s survey was undertaken.

Location of Survey

Newcastle ( Iron Ships Report for Usworth, 20th September 1869 1869, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Cover Note for reports for Usworth, 8th September 1880 1880 )

Newcastle on Tyne ( Half Midship Section Plan for Usworth, 12th May 1869 1869 )

Sunderland ( Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879 )

South Shields; Newcastle ( Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

London ( Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879 )

A vessel’s means of propulsion.

Propulsion

Steam ( Iron Ships Report for Usworth, 20th September 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

undefined ( Half Midship Section Plan for Usworth, 12th May 1869 1869 )

Sail ( Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

Broad categories and subdivisions of vessels related to their purpose or function.

The year in which a vessel’s construction is completed.

Year of ship completion

1869 ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Charles Mitchell & Co ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

The individual and/or organisation listed

Ship owner

John Jonassohn ( Iron Ships Report for Usworth, 20th September 1869 1869 )

J Jonassohn ( Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875 )

G J Nasschn ( Report of Survey for Repairs for Usworth, 2nd October 1872 1872 )

J Johnasson ( Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876 )

J J Nassohn Usworth Colliery Office Quaryside, Newcastle ( Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875 )

J Johnson ( Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878 )

Gordon & Stamp ( Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Iron Ships Report for Usworth, 20th September 1869 1869, Half Midship Section Plan for Usworth, 12th May 1869 1869, Engineer\'s Certificate for Usworth, 3rd September 1869 1869, Annual Surveys Report for Usworth, 7th June 1871 1871, Report of Survey for Repairs for Usworth, 2nd October 1872 1872, Report of Survey for Repairs for Usworth, 1st October 1873 1873, Annual Surveys Report for Usworth, 17th October 1873 1873, Report of Survey for Repairs, &c for Usworth, 9th February 1875 1875, Report of Survey for Repairs, &c for Usworth, 11th November 1875 1875, Report of Survey for Repairs, &c for Usworth, 19th April 1876 1876, Report of Survey for Repairs of Engines & Boilers for Usworth, 14th September 1876 1876, Report of Survey for Repairs, &c for Usworth, 29th September 1876 1876, Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876, Details of Main Boilers of the Steam Ship Usworth, September 1876 1876, Annual Surveys Report for Usworth, 28th January 1878 1878, Report of Survey for Repairs, &c for Usworth, 23rd March 1878 1878, Report of Survey for Repairs, &c for Usworth, 27th February 1879 1879, Report of Survey for Repairs of Engines & Boiler for Usworth, 7th March 1879 1879, Report of Survey for Repairs, &c for Usworth, 18th July 1879 1879, Report of Survey for Repairs, &c for Usworth, 31st December 1879 1879, Report of Survey for Repairs of Engines & Boilers for Usworth, 1879 1879, Cover Note for reports for Usworth, 8th September 1880 1880, Report of Survey for Repairs, &c for Usworth, 6th July 1880 1880, Report of Survey for Repairs, &c for Usworth, 12th November 1880 1880 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Direct Acting Screw Engines ( Engineer\'s Certificate for Usworth, 3rd September 1869 1869 )

Compound Inverted Direct Acting Surface Condensing ( Engineer Surveyor's Report on Machinery for Usworth, 14th September 1876 1876 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.