Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Tylon ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date )
Valborg ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
09/05/1914 ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Unique identifier for a given ship, it is assigned by a builder.
70 ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Location where a vessel’s survey was undertaken.
Hoboken Lez Anvers ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913 )
Hoboken; Antwerp ( Steel Steamer Report for Valborg, 26th June 1914 1914 )
Sunderland ( Report on Machinery for Valborg, 1st May 1914 1914 )
Gothenburg ( Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949 )
Uddevalla; Gothenburg ( Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949 )
London ( Report of Survey for Repairs, &c for Tylon, undated no date )
Antwerp ( Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
A vessel’s means of propulsion.
Steam ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
undefined ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949 )
Is the steamer assisted by sail?
No ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Is machinery fitted at the aft of the vessel?
No ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
1913 ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913 )
1914 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914 )
1949 ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949 )
0000 ( Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
The listed port to which a given vessel belongs.
Esbjerg ( Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914 )
Halmstad ( Report of Survey for Repairs, &c for Tylon, undated no date )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyd\'s A & CP +LMC 6,14 ( Steel Steamer Report for Valborg, 26th June 1914 1914 )
+LMC 6,14 ( Report on Machinery for Valborg, 1st May 1914 1914 )
+100A1 ( Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949 )
(...) ( Report of Survey for Repairs, &c for Tylon, undated no date )
+100A1; (Contemplated) ( Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
The name of the port/place of destination given.
Stolpmunde ( Steel Steamer Report for Valborg, 26th June 1914 1914 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
812 ( Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914 )
847 ( Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949 )
1018 ( Report of Survey for Repairs, &c for Tylon, undated no date )
813 ( Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Location of construction for a vessel’s engines.
Sunderland ( Report on Machinery for Valborg, 1st May 1914 1914 )
The port in which a vessel is registered or permanently based.
Halmstad ( Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949 )
Esbjerg ( Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
The year in which a vessel’s construction is completed.
1914 ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Antwerp Engineering Co Ltd ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Hoboken, Belguim ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Screw Steamer ( Steel Steamer Report for Valborg, 26th June 1914 1914 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Does the vessel possess an auxiliary power source?
No ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Is electric lighting fitted to the vessel?
No ( Profile & Deck Plan for Tylon, 10th September 1913 1913, Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914, Report C.11 Continued, Memorandum of alterations since ship Surveyed for assignment of Load Lines for Valborg, 12th May 1943 1943, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
A vessel’s calculated maximum speed.
1913 ( Profile & Deck Plan for Tylon, 10th September 1913 1913 )
r 1913 ( Midship Section Plan for Tylon, 10th September 1913 1913, Plan of Cast Steel Stern Post & Rudder for Tylon, 19th September 1913 1913 )
1914 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Valborg, 2nd July 1914 1914, Steel Steamer Report for Valborg, 26th June 1914 1914, Report on Machinery for Valborg, 1st May 1914 1914 )
1949 ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Tylon, 3rd November 1949 1949, Letter from S Townshend, for the Surveyors, Gothenburg, to the Secretary, London, regarding Tylon, 20th October 1949 1949, Translation of Letter from Rederiaktiebolaget Hallandskust, to Lloyd\'s Register of Shipping, Gothenburg, regarding Tylon, 19th October 1949 1949, Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Surveys for Freeboard for Tylon, 4th May 1949 1949, Report of Surveys for Freeboard - Conditions of Assignment for Tylon, April 1949 1949 )
ated ( Report of Survey for Repairs, &c for Tylon, undated no date, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
Dampskibsselskabet Vesterhavet ( Steel Steamer Report for Valborg, 26th June 1914 1914, Report of Surveys for Freeboard-Steam Ships for Valborg, undated no date )
J Lauritzen ( Report on Machinery for Valborg, 1st May 1914 1914 )
Rederi A/B Hallandskust ( Report of Surveys for Freeboard for Tylon, April 1949 1949, Report of Survey for Repairs, &c for Tylon, undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Recorded information related to a vessel’s movements.
Hoboken; Antwerp; Stolpmunde ( Steel Steamer Report for Valborg, 26th June 1914 1914 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Valborg, 26th June 1914 1914 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Valborg, 1st May 1914 1914 )
Date in which construction of a vessel’s engines were completed.
Have you noticed missing or incorrect data or images for this ship?