Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Turuga Maru ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942 )
Tsuruga Maru ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
The process of transferring a vessel to water, but not necessarily her completion.
08/03/1916 ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Unique identifier for a given ship, it is assigned by a builder.
250 ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Location where a vessel’s survey was undertaken.
Nagasaki ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Yokohama ( Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941 )
A vessel’s means of propulsion.
Steam ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Is the steamer assisted by sail?
No ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Is machinery fitted at the aft of the vessel?
No ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
1916 ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916 )
1941 ( Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941 )
0000 ( Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nag ( Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Yka ( Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941 )
The individual and/or organisation listed
Nippon Yusen Kaisha ( Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Nippon Yusen K K ( Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Recorded information related to a vessel’s movements.
Nagasaki; London ( Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916 )
Location of construction for a vessel’s engines.
Nagasaki ( Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941 )
The port in which a vessel is registered or permanently based.
The year in which a vessel’s construction is completed.
1916 ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Mitsubishi Dockyard & Engine Works ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Nagasaki ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Twin Screw Steamer ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
undefined ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Does the vessel possess an auxiliary power source?
No ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
Is electric lighting fitted to the vessel?
No ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916, Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941, Memo stating that the class of Turuga Maru is to be omitted from reprints of the register book, under instructions of the Classing Committee, 12th June 1942 1942, Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
A vessel’s calculated maximum speed.
1916 ( Profile & Deck Plan for Turuga Maru, 3rd June 1916 1916, Half Midship Section Plan for Turuga Maru, 3rd June 1916 1916, Plan of Rudder, Stern Frame & Shaft Brackets for Turuga Maru, 3rd June 1916 1916, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Tsuruga Maru, 19th July 1916 1916, Provisional Freeboard Certificate for Tsuruga Maru, 21st June 1916 1916, Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916, Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916 )
1941 ( Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941 )
June ( Report on Electric Lighting Installation for Tsuruga Maru, 3rd June no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7289 ( Copy of Certificate of Survey of Repairs for Tsuruga Maru, 21st June 1916 1916, Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916, Copy of Certificate of Survey of Boiler & Machinery for Tsuruga Maru, 19th June 1916 1916, Report on Machinery for Tsuruga Maru, 21st June 1916 1916 )
7278 ( Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916 )
6988 ( Copy of Certificate of Survey of Damage & Repairs for Turuga Maru, 24th April 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941 )
The listed port to which a given vessel belongs.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Nippon Yusen Kaisha ( Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyds A & CP; +LMC 6,16 FD ( Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916 )
+LMC 6,16; FD ( Report on Machinery for Tsuruga Maru, 21st June 1916 1916 )
+100A1 Contemplated ( Report of Surveys for Freeboard-Steam Ships for Turuga Maru, 28th March 1916 1916 )
Omit Class on Re-Print ( Report of Survey for Repairs, &c, of Engines & Boilers for Turuga Maru, 30th April 1941 1941 )
The name of the port/place of destination given.
London ( Steel Steamer Report for Tsuruga Maru, 22nd June 1916 1916 )
Type and configuration of the engine(s) supplied for a vessel.
Twin Screw Triple Expansion ( Report on Machinery for Tsuruga Maru, 21st June 1916 1916 )
Date in which construction of a vessel’s engines were completed.