Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Tredinnick ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
25/11/1920 ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
464 ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Location where a vessel’s survey was undertaken.
Sunderland ( Ship Forgings Form for Tredinnick, 18th June 1920 1920 )
South Shields; Newcastle ( Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Report on Boilers for Tredinnick, Undated no date )
New York ( Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942 )
Brooklyn; New York ( Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Is electric lighting fitted to the vessel?
No ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
The official record pronounced by the Committee
Missing ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
Missing between New York & Table Bay ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Name of surveyor.
John Macdonald ( Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921 )
W L Hall ( Report on Machinery for Tredinnick, 21st February 1921 1921, Report on Boilers for Tredinnick, Undated no date )
The listed port to which a given vessel belongs.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
E Hain & Son ( Steel Steamer Report for Tredinnick, 5th March 1921 1921 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter Dk with fbd; +LMC 2,21 FD; Lloyds A & CP ( Steel Steamer Report for Tredinnick, 5th March 1921 1921 )
+LMC 2,21; FD ( Report on Machinery for Tredinnick, 21st February 1921 1921 )
+100A1 Shelter deck with freeboard 10,41; S S No 3 Fal 9,34; S S Cff No 1,39; +LMC 3,39; BS 5,41; TS (CL) 3,39 ( Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942 )
+100A1 Shelter dk with fbd 10,41; SS No 3 - 9,34; SS No 1-39; +LMC 3,39; BS 5,41; TS 3,39 CL ( Report of Total Loss, Casualty, &c for Tredinnick, Undated no date )
The name of the port/place of destination given.
Australia ( Steel Steamer Report for Tredinnick, 5th March 1921 1921 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4597 ( Steel Steamer Report for Tredinnick, 5th March 1921 1921 )
4589 ( Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date )
Location of construction for a vessel’s engines.
South Shields ( Report on Machinery for Tredinnick, 21st February 1921 1921, Report on Boilers for Tredinnick, Undated no date )
The year in which a vessel’s construction is completed.
1921 ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J Readhead & Sons ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
South Shields ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
A vessel’s means of propulsion.
Steam ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
undefined ( Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942 )
Is the steamer assisted by sail?
No ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Has not been heard of since left New York ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Recorded date for the vessel’s loss or disposal.
24/06/1942 ( Ship Forgings Form for Tredinnick, 18th June 1920 1920, Remarks of the Chief Ship Surveyor to The Classing Committee regarding class of Tredinnick, 9th March 1921 1921, Freeboard Verification Form for Steamers for Tredinnick, 2nd February 1921 1921, Letter from J Macdonald, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, forwarding the ship forging report for Tredinnick, 12th March 1921 1921, Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Letter from A W Griffin, Secretary for The Hain Steamship Co Ltd, London, to the Secretary for Lloyd's Register, Wokingham, acknowledging receipt of a letter regarding overdue survey for Tredinnick, 14th May 1942 1942, Memo to the Chief Ship Surveyor regarding condition & repairs for Tredinnick, 14th May 1942 1942, Letter from Malcolm K Scott, Secretary for Lloyd's Register, Wokingham, to The Hain Steamship Co Ltd, London, regarding overdue Screw Shaft Survey for Tredinnick, 12th May 1942 1942, Certificate of Survey of Temporary Repairs for Tredinnick, 27th March 1942 1942, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report of Total Loss, Casualty, &c for Tredinnick, Undated no date, Report on Boilers for Tredinnick, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
Hain Steamship Co Ltd ( Steel Steamer Report for Tredinnick, 5th March 1921 1921, Report on Machinery for Tredinnick, 21st February 1921 1921, Report of Survey for Repairs, &c for Tredinnick, 7th March 1942 1942, Report on Boilers for Tredinnick, Undated no date )
Hain Steamship Co, Ltd ( Report of Total Loss, Casualty, &c for Tredinnick, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J R Murray ( Steel Steamer Report for Tredinnick, 5th March 1921 1921 )
Recorded information related to a vessel’s movements.
South Shields; Texas; Australia ( Steel Steamer Report for Tredinnick, 5th March 1921 1921 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Tredinnick, 5th March 1921 1921 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Tredinnick, 21st February 1921 1921 )
Date in which construction of a vessel’s engines were completed.
1921 ( Report on Machinery for Tredinnick, 21st February 1921 1921, Report on Boilers for Tredinnick, Undated no date )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.