Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Topaze ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/12/1878 ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

__/12/1878 ( Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899 )

A vessel’s means of propulsion.

Propulsion

undefined ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892 )

Steam ( Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Compound Surface Condensing ( Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879 )

Inverted Triple Expansion 3 Cranks ( Report on Machinery for Topaze, 12th August 1892 1892 )

The year in which a vessel’s construction is completed.

Year of ship completion

1878 ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

C S Swan & Co ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Newcastle ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Iron ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan Shewing Stiffening of Bulkheads where Water Ballast extends to Hold Beams for Topaze, 5th June 1878 1878, Plan Shewing Arrangement of Hold & Panting Beams for Topaze, 3rd June 1878 1878, Half Midship Section Plan for Topaze, 8th May 1878 1878, Iron Ship Report for Topaze, 6th February 1879 1879, Engineer Surveyor's Report on Machinery for Topaze, 3rd February 1879 1879, Report of Survey for Repairs, &c for Topaze, 11th July 1879 1879, Report of Survey for Repairs, &c for Topaze, 12th April 1880 1880, Report of Survey for Repairs, &c for Topaze, 26th May 1880 1880, Report of Survey for Repairs, &c for Topaze, 9th May 1890 1890, Notes Concerning Plan of Main Boiler for Topaze, 19th August 1891 1891, Plan of Two Main Boilers for Topaze, 14th August 1891 1891, Memo from Chief Surveyor to the classing Committee, regarding S S No 1 & Damage for Topaze, 29th August 1892 1892, Report of Survey for Repiars, &c for Topaze, 25th August 1892 1892, Report on Machinery for Topaze, 12th August 1892 1892, Form from Alex Douglas, The Surveyors, to The Secretary, Lloyd\'s Register, London, Returning Report of Survey for Topaze, 2nd May 1892 1892, Plan of Deep Tanks for Topaze, 22nd February 1899 1899, Memo from Chief Surveyor to the Classing Committee regarding alteration, condition & class of Topaze, 10th April 1899 1899, Report of Survey for Repairs, &c for Topaze, 8th April 1899 1899, Report of Survey Repairs, &c, of Engines & Boilers for Topaze, 8th April 1899 1899, Donkey Boiler form for Topaze, sent by Newcastle Surveyor, John Brockat, to The Surveyors, West Hartlepool, Undated no date )

The port in which a vessel is registered or permanently based.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.