Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1830 ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
The port or place in which the vessel’s construction took place, at the time of writing.
Gt Yarmouth ( Survey Report for Tiber, 4th November 1835 1835 )
Great Yarmouth ( Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
The listed port to which a given vessel belongs.
Yarmouth/Great Yarmouth ( Survey Report for Tiber, 4th November 1835 1835 )
London ( Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Candler ( Survey Report for Tiber, 4th November 1835 1835 )
Location where a vessel’s survey was undertaken.
London ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
Recorded information related to a vessel’s movements.
London; Alexandria ( Survey Report for Tiber, 4th November 1835 1835 )
London; Australia ( Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
Physical arrangement of a ship’s masts, sails and rigging.
Bg - Brig ( Survey Report for Tiber, 4th November 1835 1835 )
S - Ship ( Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
Predominant material(s) utilised in a vessel’s construction.
Wood ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
The year in which a vessel’s construction is completed.
1830 ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Coslerton ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
The individual and/or organisation listed
T & A Stewart ( Survey Report for Tiber, 4th November 1835 1835 )
Robinson ( Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
Name of surveyor.
Peter Courtenay ( Survey Report for Tiber, 4th November 1835 1835 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 10 Years ( Survey Report for Tiber, 4th November 1835 1835 )
Expunge Character ( Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
The name of the port/place of destination given.
Alexandria ( Survey Report for Tiber, 4th November 1835 1835 )
Australia ( Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
No ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
No ( Survey Report for Tiber, 4th November 1835 1835, Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
177 ( Report of Survey for Repairs for Tiber, 1st March 1854 1854 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.