Name of ship as recorded on the record
Thursby ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
__/02/1876 ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888 )
Iron ( Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Is electric lighting fitted to the vessel?
No ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888 )
Lon ( Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899 )
Grk ( Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Report on Boilers for Thursby, 13th November 1909 1909 )
The individual and/or organisation listed
J H Thursby Bart ( Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888 )
S J H Thursby BB ( Report on Machinery for Thursby, 23rd November 1888 1888 )
J S Sellers ( Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Report on Boilers for Thursby, 13th November 1909 1909 )
Ribble Shipping Co Ltd ( Report of total loss and casualty for Thursby, 10 September 1923 1923 )
Location where a vessel’s survey was undertaken.
Belfast ( Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888 )
Glasgow ( Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Engine Castings Form for Thursby, 9th October 1909 1909 )
London ( Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899 )
Liverpool ( Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923 )
Port Glasgow; Greenock ( Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Report on Boilers for Thursby, 13th November 1909 1909 )
Greenock ( Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Port Glasgow ( Plan of Main Boiler for Thursby, 12th August 1909 1909 )
Recorded information related to a vessel’s movements.
Belfast; Channel ( Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888 )
London; Liverpool ( Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899 )
Longships, Cornwall ( Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
494 ( Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888 )
496 ( Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Report on Boilers for Thursby, 13th November 1909 1909 )
267 ( Report of total loss and casualty for Thursby, 10 September 1923 1923 )
Location of construction for a vessel’s engines.
Belfast ( Report on Machinery for Thursby, 23rd November 1888 1888, Report on Boilers for Thursby, 13th November 1909 1909 )
Name of surveyor.
A Campbell Holms; George P Cooper ( Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899 )
William R Austin ( Report on Boilers for Thursby, 13th November 1909 1909, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
William Ritchie Austin ( Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Ship Forgings Form for Thursby, Undated no date )
The name of the port/place from which a vessel’s voyage originated.
Portsmouth ( Report of total loss and casualty for Thursby, 10 September 1923 1923 )
Recorded information relating the specific cargo being conveyed.
iron, scrap ( Report of total loss and casualty for Thursby, 10 September 1923 1923 )
The year in which a vessel’s construction is completed.
1876 ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Form for Particulars of Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Harland & Wolff Ltd ( Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Ship Forgings Form for Thursby, Undated no date )
A vessel’s means of propulsion.
Steam ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
undefined ( Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905 )
Is the steamer assisted by sail?
No ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Extract from Liverpool Surveyor's Letter regarding survey of Thursby, 27th July 1888 1888, Letter from the Secretary to the Belfast Surveyors, regarding report for Thursby, 30th July 1888 1888, Memo regarding a part 3rd survey completed for Thursby, 17th July 1888 1888, Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Form for Particulars for Record of Material of Boilers for Thursby, 30th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888, Report of boiler Steel for Thursby, 2nd August 1888 1888, Report for Tests of Boiler Steel for Thursby, 13th August 1888 1888, Plan of New Main Boiler for Thursby, 29th June 1888 1888, Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Cover note Boiler Report for Thursby, sent to Port of Liverpool 9th February 1905 1905, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor, regarding Thursby, 25th November 1909 1909, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Report on Boilers for Thursby, 13th November 1909 1909, Special Survey Request form for a New Boiler for Thursby, 2nd September 1909 1909, Engine Castings Form for Thursby, 9th October 1909 1909, Plan of Rudder & Sternpost for Thursby, 3rd September 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Form for Particulars of Thursby, Undated no date, Ship Forgings Form for Thursby, Undated no date, Engine Forgings Form for Thursby, Undated no date )
The listed port to which a given vessel belongs.
Fleetwood ( Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888 )
Liverpool ( Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899, Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Report on Boilers for Thursby, 13th November 1909 1909 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J McCarthy ( Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888, Report on Machinery for Thursby, 23rd November 1888 1888 )
J Hudson ( Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908 )
Hudson ( Report on Boilers for Thursby, 13th November 1909 1909 )
Captain William Lee ( Report of total loss and casualty for Thursby, 10 September 1923 1923 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 Asterisk 1; Third Survey 88; +NB 88 ( Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888 )
+NB 88 ( Report on Machinery for Thursby, 23rd November 1888 1888 )
+A1 asterisk 1 ( Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899 )
A1x1 Red 11,09; 2nd Survey PGL 11,09; +LMC 11,09; +NB 11,09 ( Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908 )
LMC 11,09; +NB 11,09 ( Report on Boilers for Thursby, 13th November 1909 1909 )
+A1 X1 5.23; 6th Sws 11.00; 5th 9.21; in red; +NB 11.09; LMC 9.21; BS 4.23 ( Report of total loss and casualty for Thursby, 10 September 1923 1923 )
The name of the port/place of destination given.
Channel ( Report of Survey for Repairs, &c. for Thursby, 28th November 1888 1888 )
Liverpool ( Report of Survey for Repairs, &c for Thursby, 26th June 1899 1899 )
Barrow ( Report of total loss and casualty for Thursby, 10 September 1923 1923 )
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted direct acting Surface Condg ( Report on Machinery for Thursby, 23rd November 1888 1888 )
Date in which construction of a vessel’s engines were completed.
1876 ( Report on Machinery for Thursby, 23rd November 1888 1888, Report on Boilers for Thursby, 13th November 1909 1909 )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom ( Report of Survey for Repairs, &c for Thursby, 13th November 1908 1908, Letter from John Whitehead, Dock Master to the Surveyor, regarding condition of masts, spars, & rigging for Thursby, 13th November 1909 1909, Memo regarding equipment renewals for Thursby, 25th November 1909 1909, Note relating to Plan of Steel Main Boiler for Thursby, 12th August 1909 1909, Letter from J P Dunlop, the Secretary, The Clyde Shipbuilding & Engineering Co Ltd to the Secretary, Lloyd's Register , regarding fees for Thursby, 16th August 1909 1909, Plan of Main Boiler for Thursby, 12th August 1909 1909, Letter from John Sellers & Co, to the Secretary of Lloyd's Register London communicating that the vessel Thursby has foundered in deep water off the Longships, Cornwall, 7 September 1923 1923, Report of total loss and casualty for Thursby, 10 September 1923 1923, Ship Forgings Form for Thursby, Undated no date )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
J S Sellers & Co ( Report of total loss and casualty for Thursby, 10 September 1923 1923 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
496 ( Report of total loss and casualty for Thursby, 10 September 1923 1923 )