Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Dun ( Survey Report for Telegram, 28th September 1858 1858 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Name recorded as the superintendent of the proving house.

The individual and/or organisation listed

Name of surveyor.

Recorded information related to a vessel’s movements.

Voyage information

Perth; Coasting ( Survey Report for Telegram, 28th September 1858 1858 )

Physical arrangement of a ship’s masts, sails and rigging.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.