Name of ship as recorded on the record
Tasso ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Lech ( Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937 )
The process of transferring a vessel to water, but not necessarily her completion.
17/12/1937 ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Unique identifier for a given ship, it is assigned by a builder.
1580 ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Location where a vessel’s survey was undertaken.
London ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937 )
Newcastle on Tyne 1 ( Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Newcastle on Tyne ( Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937 )
Newcastle on Tyne 6 ( Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Does the vessel possess an auxiliary power source?
No ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Is electric lighting fitted to the vessel?
No ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Vessel’s area of loss or disposal/last known recorded location.
Atlantic ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Type and configuration of the engine(s) supplied for a vessel.
Triple expansion combined with exhaust turbine on Bauerwach system ( Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937 )
The year in which a vessel’s construction is completed.
1937 ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Swan, Hunter & Wigham Richardson Ltd ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle - On - Tyne ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
A vessel’s means of propulsion.
undefined ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937 )
Steam ( Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Is the steamer assisted by sail?
No ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Is machinery fitted at the aft of the vessel?
No ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Vessel’s place of loss or disposal/last known recorded location.
Atlantic ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )
Recorded date for the vessel’s loss or disposal.
02/12/1940 ( Letter from the Secretary for Lloyd's register London to the Newcastle Surveyors returning copies of thrust shaft & cone coupling plan for Tasso, 10th November 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding cone coupling design alteration for Tasso, 1st November 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding main boiler mixing steam connections for Tasso, 30th October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter & drawing regarding amended auxiliary stop valves for Tasso, 28th October 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, to the Newcastle Surveyors regarding valve proposals for Tasso, 27th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding non-return valves for Tasso, 22nd October 1937 1937, Memo regarding non-return valves for Tasso, 22nd October 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing a letter concerning mixing valves for Tasso, 16th October 1937 1937, Letter from Ivan M Tweedy, for Swan Hunter & Wigham Richardson Ltd, to the Newcastle Surveyors regarding boiler safety valves for Tasso, 15th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning electric equipment plans for Tasso, 12th October 1937 1937, Memo regarding approval of electrical equipment plans for Tasso, 11th October 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting plans showing proposed electrical installation for Tasso, 8th October 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of pipe & boiler mounting arrangements for Tasso, 20th September 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting pipe & boiler mounting arrangements for Lech, 4th September 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding size of thrust shaft for Tasso, 7th May 1937 1937, Steam Engine Shafting Endorsement for Tasso, 5th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London enclosing drawing of thrust shaft & cone coupling for Tasso, 30th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding engine particulars for Tasso, 26th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding approval of main boiler plan for Tasso, 5th April 1937 1937, Boiler Endorsement for Tasso, 1st April 1937 1937, Memo regarding shafting sizes for Tasso, 5th April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting several plans for Tasso, with reference to the boilers & machinery, 25th March 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of pumping arrangement plan for Tasso, 18th June 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th June 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting drawing of bilge, ballast & feed suction arrangements for Tasso, 14th June 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors regarding proposed use of general service pump for Tasso, 26th May 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London submitting a letter regarding general service pump for Tasso, 24th May 1937 1937, Letter from Swan Hunter & Wigham Richardson Ltd to the Newcastle Surveyors regarding general service pump for Tasso, 22nd May 1937 1937, Letter from Thomas Morrison, Director for Swan Hunter & Wigham Richardson Ltd, to the Secretary for Lloyd's Register London acknowledging receipt of approved general pumping arrangement plan for Tasso, 20th April 1937 1937, Letter from the Secretary for Lloyd's Register London to Swan Hunter & Wigham Richardson Ltd, Newcastle Shipbuilders, regarding approval of General Pumping Arrangement Plan for Tasso, 19th April 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors enclosing a copy of a letter regarding approval of General Pumping Arrangement for Tasso, 19th April 1937 1937, Pumping Arrangement Endorsement for Tasso, 17th April 1937 1937, Letter from the Secretary for Lloyd's Register London to J W Gwynne, Bristol Surveyor, enclosing of copy of an order for mild steel shells for Tasso, 6th May 1937 1937, Letter from the Secretary for Lloyd's Register London to Caird & Rayner Ltd, Shipbuilders, acknowledging receipt of survey request form for Tasso, 6th May 1937 1937, Letter from C W McKenzie, for Caird & Rayner Ltd, to the Secretary for Lloyd's Register London enclosing a copy of order for mild steel shells for Tasso, 5th May 1937 1937, Request for Inspection Services from for Caird & Rayner Ltd, C W McKenzie for Tasso, 5th May 1937 1937, Letter from the Secretary for Lloyd's Register London to the Newcastle Surveyors returning copies of main stop valve saddle plate plan for Tasso, 1st April 1937 1937, Letter from A Watt, Newcastle Surveyor, to the Secretary for Lloyd's Register London forwarding a drawing of main stop valve saddle plate for Tasso, 27th March 1937 1937, Letter from W T Badger, Newcastle Surveyor, to the Secretary for Lloyd's Register London regarding direction finding apparatus for Tasso, 19th February 1938 1938 )