Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The year in which a vessel’s construction is completed.

Year of ship completion

1924 ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

R & W Hawthorn Leslie & Co Ltd ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Hebburn-on-Tyne ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Newcastle ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924 )

Newcastle on Tyne ( Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924 )

London ( Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924 )

Hebburn on Tyne; Newcastle on Tyne ( Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924 )

Hebburn; Newcastle; Newcastle on Tyne ( Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924 )

Newcastle; Newcastle on Tyne ( Report on Electric Fittings for Talamba, 2nd October 1924 1924 )

Alexandria ( Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

13/07/1943 ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 with freeboard; Lloyds A & CP; +LMC 10,24; FD CL; Fitted for Oil fuel 10,24 FP above 150F ( Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924 )

+LMC 10,24 FD CL; Fitted for Oil Fuel 10,24 FP above 150F ( Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924 )

+100A1 with freeboard 11,42; S S H Kg No 3-3,38; Examined 3,43; +LMC 4,42; B S 3,43; TS CL S12,39; P10,40; Fitted for oil fuel 10,24 FP above 150F ( Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943 )

+100A1; With Fbd 11,42; Examined 3,43; S S No 3-3,38; +LMC 4,42; B S 3,43; TS 12,39; P 10,40 CL Fitted for Oil Fuel 10,24 FP above 150F ( Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Type and configuration of the engine(s) supplied for a vessel.

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

16/07/1924 ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

533 ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

undefined ( Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Bombed & Sunk ( Request for Special Survey of Boilers & Engines for Talamba, 15th October 1923 1923, Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Copy of Telegram regarding certificates for Talamba, 24th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Name of ship as recorded on the record

Ship name

Talamba ( Profile & Deck Plans for Talamba, 14th May 1923 1923, Plan of Half Midship Section for Talamba, 14th May 1923 1923, Plan of Details of Shafting for Talamba, 27th August 1923 1923, Plan of Main Boiler for Talamba, 16th May 1923 1923, Plan of Main Boiler for Talamba, 7th June 1923 1923, Plan of Shafting & Plummer Blocks for Talamba, 26th May 1923 1923, Memo regarding official under deck tonnage for Talamba, 28th October 1924 1924, Letter from G L Brown, Newcastle Surveyor, to the Secretary for Lloyd's Register, London, regarding forecastle stringer for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram & returning classification certificates for engines & boilers for Talamba, 25th October 1924 1924, Letter from the Assistant to the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a certificate specifying number of cylinders for Talamba, 25th October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting fresh certificate specifying cylinders for Talamba, 25th October 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for certificates for Talamba, 24th October 1924 1924, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Talamba, 23rd November 1924 1924, Letter from S R Davies, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, confirming a telegram regarding a request for classification certificates for Yard No 533, 23rd October 1924 1924, Telegram from Lloyd's Register, Newcastle, to the Committee, London, requesting classification certificates for Talamba, 23rd October 1924 1924, Freeboard Verification form for Steamers for Talamba, 29th August 1924 1924, Steel Steamer or Motorship Report for Talamba, 13th October 1924 1924, Report on Steam Reciprocating Engine Machinery for Talamba, 2nd October 1924 1924, Report on Boilers for Talamba, 2nd October 1924 1924, Report on Electric Fittings for Talamba, 2nd October 1924 1924, Plan of Midship Section, as built, for Talamba, 23rd September 1924 1924, Memo from the Chief Ship Surveyor to Chief Engineer Surveyor regarding the 2nd SS No 1 for Talamba, 17th December 1943 1943, Certificate of Survey of Part Machinery for Talamba, 18th June 1943 1943, Report of Survey for Repairs, &c, of Engines & Boilers for Talamba, 18th June 1943 1943, Report of Total Loss, Casualty, &c for Talamba, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The port in which a vessel is registered or permanently based.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.