Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Bretwalda ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919 )

Start Point ( Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

03/04/1919 ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

321 ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

undefined ( Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Atlantic ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

London ( Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919 )

Sunderland ( Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919 )

Middlesbrough ( Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919 )

Newcastle ( Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919 )

Stockton on Tees; Middlesbrough ( Report on Machinery for Bretwalda, 2nd June 1919 1919 )

Hull ( Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942 )

Tipton ( Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

Sunderland; Blyth ( Steel Steamer Report for Bretwalda, 11th June 1919 1919 )

The port in which a vessel is registered or permanently based.

The year in which a vessel’s construction is completed.

Year of ship completion

1919 ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

The Sunderland Shipbuilding Co Ltd ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sunderland ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

26/11/1942 ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Middlesbrough, regarding fees for Bretwalda, 16th June 1919 1919, Copy of letter from the Secretary of Lloyd's Register to The Surveyors at Sunderland, regarding fees for Bretwalda, 14th June 1919 1919, Memo regarding fees to be charged in light of partially completed hull & machinery for Bretwalda, 12th June 1919 1919, Letter from T Shaw, Sunderland Principal Surveyor, to Secretary of Lloyd's Register, London, forwarding reports on hull & machinery & requesting fees to be charged due to Builders taking over for Bretwalda, 11th June 1919 1919, Steel Steamer Report for Bretwalda, 11th June 1919 1919, Copy of letter from William Morrison, Middlesbrough Surveyor, to Sunderland Surveyors informing of vessel leaving for Sunderland after machinery fitted & works required to complete survey on machinery for Bretwalda, 7th May 1919 1919, Form for Vessels of 100 Tons & Upwards for Bretwalda, 31st May 1919 1919, Report on Machinery for Bretwalda, 2nd June 1919 1919, Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919, Proposed Centre Line Bulkhead Plan for Start Point, 22nd February 1919 1919, Half Midship Section Plan for Start Point, 10th April 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding the 2nd SS No 2 for Start Point, 3rd September 1942 1942, Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942, Certificate of Survey for Start Point, 8th August 1942 1942, Receipt for materials manufactured by Horseley Bridge & Thomas Piggott Ltd for Start Point, 10th August 1942 1942, Memo from the Chief Engineer Surveyor to the Classing Committee regarding special survey of boilers & general examination party held of Start Point, 4th September 1942 1942, Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942, Report of Total Loss, Casualty, &c for Start Point, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Lloyds A & CP; +LMC 6,19; FD ( Steel Steamer Report for Bretwalda, 11th June 1919 1919 )

+LMC 6,19; FD ( Report on Machinery for Bretwalda, 2nd June 1919 1919 )

Elec Light ( Report on Electric Lighting Installation for Bretwalda, 2nd June 1919 1919 )

+100A1 Subject; Examined 8,42 ( Report of Survey for Repairs, &c for Start Point, 15th August 1942 1942 )

+100A1 1, 42; SS CFF No 3 3,32; SS Shl No 1-36; +LMC; MS 10,36; BS 1,42; TS-CL 5,39 ( Report of Survey for Repairs, &c, of Engines & Boilers for Start Point, 14th August 1942 1942 )

+100A1 8,42; Examined 8,42; SS No 3-3,32; SS No 1-36; +LMC MS 10,36; BS 1,42; TS 6,42 CL ( Report of Total Loss, Casualty, &c for Start Point, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Type and configuration of the engine(s) supplied for a vessel.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.