Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Stanmore ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

22/05/1940 ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

243 ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

undefined ( Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Torpedoed & beached ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Type and configuration of the engine(s) supplied for a vessel.

The year in which a vessel’s construction is completed.

Year of ship completion

1940 ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

William Pickersgill & Sons Ltd ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sunderland ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Sunderland ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940 )

Newcastle on Tyne ( Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940 )

London ( Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940 )

Wokingham ( Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939 )

Wallsend; Newcastle on Tyne ( Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/10/1943 ( Request for Special Survey of Stanmore, 11th July 1939 1939, Profile & Deck Plan for Stanmore, 20th July 1939 1939, Half Midship Section Plan for Stanmore, 20th July 1939 1939, Plan of Boiler for Stanmore, 12th May 1939 1939, Plan of Auxiliary Boiler for Stanmore, 12th May 1939 1939, Letter from A McGlashan, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, submitting plan of cast steel quadrant, tiller & hand gear quadrant & pinion for Stanmore, 28th October 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing sketch showing increased scantlings of tween deck frames for Stanmore, 2nd October 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plans for Stanmore, 29th September 1939 1939, Memo regarding approval of amended plans showing part profile & decks for Stanmore, 29th September 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing a letter & plans regarding Stanmore, 22nd September 1939 1939, Letter from A Charlton, for William Pickersgill & Sons Ltd, Sunderland Shipbuilders, to Lloyd's Register, Sunderland, enclosing an amended plan showing part profile & deck for Stanmore, 22nd September 1939 1939, Letter from Secretary for Lloyd's Register, London, to W Pickersgill & Sons Ltd, Sunderland Shipbuilders, regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Memo regarding approval of a plan showing alternative scantlings for centre line bulkhead stiffeners for Stanmore, 8th August 1939 1939, Letter from the Assistant Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding classification of Stanmore, with reference to plans of midship section, profile & decks, 31st July 1939 1939, Memo regarding requirements for classificaton of Stanmore, 29th July 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding arrangements to discuss proposed scantlings & arrangements for Stanmore, 21st July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of midship section, profile & decks for Stanmore, 20th July 1939 1939, Letter from James L Rennie, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing plans of stern & rudder frame for Stanmore, 13th July 1939 1939, Copy of Correspondence from the Surveyors, Sunderland to William Pickersgill & Sons, regarding General Pumping Arrangement for Stanmore, 20th November 1939 1939, Pumping Arrangement Endorsement for Stanmore, 13th November 1939 1939, Letter from James L Rennie & W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting a plan of bilge & ballast piping arrangement for Stanmore, 11th November 1939 1939, Letter from S T Bryden to A Pickworth Esq, Sunderland Surveyor, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from S T Bryden, for Lloyd's Register, Wokingham, to E Potts Esq, Principal Surveyor, London, regarding relief valve for Stanmore, 16th November 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of main & auxiliary boiler plans for Stanmore, 19th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Boiler Endorsement for Stanmore, 18th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, enclosing prints of main & auxiliary boilers for Stanmore, 13th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors enclosing a copy of a letter regarding machinery & boilers contract for Stanmore, 5th May 1939 1939, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding contract relating to machinery & boilers for Stanmore, 5th May 1939 1939, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding contract for machinery & boilers for Stanmore, 4th May 1939 1939, Extract from Freeboard Verification of Marking dated 1st August 1940 from Sunderland Surveyor regarding Stanmore 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Stanmore, 30th August 1940 1940, Steel Steamer or Motorship Report for Stanmore, 22nd August 1940 1940, Form for Vessels of 100 Tons & Upwards for Stanmore, 8th August 1940 1940, Memo from the Chief Engineer Surveyor to the Classing Committee regarding the engine & machinery for Stanmore, 29th August 1940 1940, Report on Steam Reciprocating Engine Machinery for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Boilers for Stanmore, 7th August 1940 1940, Report on Electrical Equipment for Stanmore, 22nd June 1940 1940, Profile & Deck Plan, as built, for Stanmore, 14th August 1940 1940, Half Midship Section Plan, as built, for Stanmore, 14th August 1940 1940, Copy of Correspondence to William Pickersgill & Sons, regarding Plans of General Arrangement of Electrical Equipment & Main Switch board for Stanmore, 28th May 1940 1940, Electrical Equipment Endorsement for Stanmore, 27th May 1940 1940, Letter from G Anderson, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plans of general arrangement of electrical equipment for Stanmore, 5th May 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, regarding capacity of bilge pumps for Stanmore, 23rd April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of plan showing pumping arrangement in the machinery space for Stanmore, 19th April 1940 1940, Pumping Arrangement Endorsement for Stanmore, 18th April 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting pumping arrangement plan for Stanmore, 17th April 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Sunderland Surveyors regarding approval of boiler pipe arrangement for Stanmore, 7th March 1940 1940, Boiler Pipe Arrangement Endorsement for Stanmore, 4th March 1940 1940, Letter from W H Fraser, for the Sunderland Surveyors, to the Secretary for Lloyd's Register, London, submitting plan showing boiler pipe arrangement for Stanmore, 1st March 1940 1940, Letter from the Secretary for Lloyd's Register, London, to the Newcastle Surveyors regarding approval of plan showing arrangement of combustion chamber superheaters for Stanmore, 18th January 1940 1940, Superheater Endorsement for Stanmore, 17th January 1940 1940, Letter from R Moffitt, for the Newcastle Surveyors, to the Secretary for Lloyd's Register, London, forwarding a plan showing arrangement of combustion chamber superheaters for Stanmore, 12th January 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Stanmore, 28th June 1943 1943, Report of Total Loss, Casualty, &c for Stanmore, Undated no date )

The port in which a vessel is registered or permanently based.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.