Name of ship as recorded on the record
Harperley ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Report on Boilers for Harperley, Undated no date )
Stamos Fafalios ( Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934 )
The process of transferring a vessel to water, but not necessarily her completion.
25/01/1906 ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
717 ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Location where a vessel’s survey was undertaken.
West Hartlepool ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905 )
Stockton on Tees ( Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905 )
West Hartlepool; Hartlepool ( Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906 )
London ( Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933 )
Ancona ( Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933 )
Ancona; Genoa ( Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933 )
London; Leith ( Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934 )
Stockton; Middlesbrough on Tees ( Report on Boilers for Harperley, Undated no date )
A vessel’s means of propulsion.
Steam ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
undefined ( Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933 )
Is the steamer assisted by sail?
No ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for breaking up Purposes ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
J & C Harrison Ltd ( Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Report on Boilers for Harperley, Undated no date )
Frederick Angier Harrison ( Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906 )
S & D Fafalios ( Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyds A & CP; +LMC 2,06 ( Steel Steamer Report for Harperley, 28th February 1906 1906 )
+LMC 2,06 ( Report on Machinery for Harperley, 20th February 1906 1906 )
BS 10,33 ( Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933 )
+100A1 7,32; SS Pir 2nd No 3-12,29; +LMC 7,29; BS 10,33 ( Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934 )
The name of the port/place of destination given.
Cardiff ( Steel Steamer Report for Harperley, 28th February 1906 1906 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3990 ( Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Report on Boilers for Harperley, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound ( Report on Machinery for Harperley, 20th February 1906 1906 )
Inverted Direct acting Triple Expansion Condensing ( Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906 )
Date in which construction of a vessel’s engines were completed.
1906 ( Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report on Boilers for Harperley, Undated no date )
The port in which a vessel is registered or permanently based.
The year in which a vessel’s construction is completed.
1906 ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Gray & Co Ltd ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
West Hartlepool ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Screw Steamer ( Plan of Boiler for Harperley, 30th August 1905 1905, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
The official record pronounced by the Committee
Broken up ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
Recorded date for the vessel’s loss or disposal.
__/__/0000 ( Plan of Steel Boilers for Harperley, 18th September 1905 1905, Plan of Combustion Chambers for Harperley, 2nd October 1905 1905, Plan of Boiler for Harperley, 30th August 1905 1905, Profile Plan for Harperley, 22nd August 1905 1905, Half Midship Section Plan for Harperley, 22nd August 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Harperley, 1st March 1906 1906, Steel Steamer Report for Harperley, 28th February 1906 1906, Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Note regarding the sale of Harperley, 29th December 1933 1933, Letter from Director, for S Livanos & Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Stamos Fafalios, 12th October 1933 1933, Translation of Letter from Gustava Badia, Acting Surveyor to Lloyd's Register, Ancona, to Lloyd's Register, Genoa, regarding the annual survey of the main & donkey boilers for Stamos Fafalios, 8th October 1933 1933, Letter from Gustavo Badia, Acting Surveyors to Lloyd's Register, to Lloyd's Register, Genova, regarding Stamos Fafalios, 8th October 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report of Total Loss, Casualty, &c for Stamos Fafalios, 6th September 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 30th August 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Leith, regarding Stamos Fafalios, 24th January 1934 1934, Report on Boilers for Harperley, Undated no date )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Recorded information related to a vessel’s movements.
West Hartlepool; Cardiff ( Steel Steamer Report for Harperley, 28th February 1906 1906 )
Physical arrangement of a ship’s masts, sails and rigging.
Name of surveyor.
James Innes ( Report on Machinery for Harperley, 20th February 1906 1906 )
John Houston ( Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th June 1934 1934, Question & Answer Memo between London & Leith Office regarding demolition of Stamos Fafalios, 6th April 1934 1934, Letter from John Houston, per The Surveyors, to The Secretary, London, regarding Stamos Fafalios, 1st February 1934 1934 )
G A Milner ( Report on Boilers for Harperley, Undated no date )
Location of construction for a vessel’s engines.
West Hartlepool ( Report on Machinery for Harperley, 20th February 1906 1906, Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906, Report of Survey for Repairs, &c, of Engines & Boilers for Stamos Fafalios, 10th October 1933 1933, Report on Boilers for Harperley, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
HFPB ( Form for Vessels of 100 Tons & Upwards for Harperley, 15th February 1906 1906 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.