Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
St Mark ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878 )
Saint Mark ( Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
The process of transferring a vessel to water, but not necessarily her completion.
26/10/1878 ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Unique identifier for a given ship, it is assigned by a builder.
250 ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879 )
Hul ( Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883 )
Lon ( Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
The individual and/or organisation listed
G Jinman & Co ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878 )
G Jininan & Co ( Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878 )
G Tinman & Co ( Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879 )
H Briggs Sons & Co ( Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883 )
Richardson, Duck & Co ( Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883 )
H Briggs & Sons ( Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Name of surveyor.
William Davidson ( Iron Ship Report for St Mark, 26th November 1878 1878 )
James Bain ( Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878 )
Thomas J Dodd; Thomas Congdon ( Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878 )
Edward Burnie ( Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879 )
Henry T Tyrrell ( Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879 )
James McNeil ( Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883 )
John B Stevens ( Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883 )
Edward John Tierney ( Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1; A & Cp; Lloyds; 2Dks; 3 Trs Burs; Iron Dk ( Iron Ship Report for St Mark, 26th November 1878 1878 )
100A1 ( Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878 )
+100A1 ( Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
+100A1; S S No 1 83; LMC 6, 83 ( Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883 )
LMC 6, 83 ( Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Iron Ship Report for St Mark, 26th November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1708 ( Iron Ship Report for St Mark, 26th November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Is machinery fitted at the aft of the vessel?
No ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Location of construction for a vessel’s engines.
Stockton on Tees ( Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878 )
Stockton ( Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883 )
Screw Steamer ( Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Recorded information related to a vessel’s movements.
Hong Kong; Singapore ( Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879 )
Cardiff; Aden ( Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879 )
Hull; Cronstadt ( Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883 )
London; Cardiff; Port Said ( Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
The name of the port/place from which a vessel’s voyage originated.
London ( Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
The year in which a vessel’s construction is completed.
1878 ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Richardson, Duck & Co ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
The listed port to which a given vessel belongs.
London ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
George E Parkins ( Iron Ship Report for St Mark, 26th November 1878 1878 )
G E Parkins ( Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878 )
Johnson ( Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Location where a vessel’s survey was undertaken.
Stockton; Hartlepool ( Iron Ship Report for St Mark, 26th November 1878 1878 )
Stockton on Tees ( Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878 )
London ( Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Hong Kong ( Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879 )
Cardiff ( Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879 )
Hull ( Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883 )
A vessel’s means of propulsion.
Steam ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
undefined ( Profile Plan for Saint Mark, 29th April 1878 1878 )
Sail ( Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879 )
Is the steamer assisted by sail?
No ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Does the vessel possess an auxiliary power source?
No ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Is electric lighting fitted to the vessel?
No ( Iron Ship Report for St Mark, 26th November 1878 1878, Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 30th November 1878 1878, Profile Plan for Saint Mark, 29th April 1878 1878, Plan of Iron Masts for Saint Mark, 14th August 1878 1878, Midship Section Plan for Saint Mark, 29th April 1878 1878, Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879, Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879, Plans of Showing Arrangement of Proposed Water Ballast Tank in Midships for Saint Mark, 3rd May 1883 1883, Plans of Proposed Alterations for Saint Mark, 3rd May 1883 1883, Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883, Report of Survey for Repairs of Engines & Boiler for Saint Mark, 16th June 1883 1883, Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted Surface Condensing ( Engineer Surveyor's Report on Machinery for St Mark, 22nd November 1878 1878 )
Date in which construction of a vessel’s engines were completed.
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Profile Plan for Saint Mark, 29th April 1878 1878 )
The name of the port/place of destination given.
Singapore ( Report of Survey for Repairs, &c for Saint Mark, 20th June 1879 1879 )
Aden ( Report of Survey for Repairs, &c for Saint Mark, 8th December 1879 1879 )
Cronstadt ( Report of Survey for Repairs, &c for Saint Mark, 15th June 1883 1883 )
Port Said ( Annual Surveys Report for Saint Mark, 24th November 1883 1883 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.