Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

St George ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

13/01/1906 ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

665 ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Birkenhead ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905 )

Liverpool ( Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906 )

Sheffield ( Engine Forgings Form for St George, 25th September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906 )

London ( Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Copy of Fragment of document regarding St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date )

Birkenhead; Liverpool ( Steel Steamer Report for St George, 3rd September 1906 1906 )

Newcastle; Liverpool ( Report on Machinery for St George, 3rd September 1906 1906 )

Glasgow ( Engine Castings Form for St George, 21st March 1906 1906 )

Parkeston Quay ( Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921 )

Falmouth ( Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921 )

A vessel’s means of propulsion.

Propulsion

Steam ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

undefined ( Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Report of Survey for Repairs, &c for St George, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

Year of ship completion

1906 ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Cammell, Laird & Co Ltd ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Birkenhead ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Twin Screw Steamer ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905 )

Triple Screw Steamer ( Profile & Deck Plan for St George, 1905 1905, Memo regarding classification for St George, 14th April 1921 1921 )

undefined ( Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Screw Steamer ( Steel Steamer Report for St George, 3rd September 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Stern Frame for St George, 23rd May 1905 1905, Plan of Rudder for St George, 1905 1905, Profile & Deck Plan for St George, 1905 1905, Half Midship Section Plan for St George, 1905 1905, Memo regarding classification for St George, 1st June 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 31st May 1905 1905, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 31st May 1905 1905, Letter from J J Welch, Shipyard Manager, for Cammell Laird & Co Ltd, to The Principal Surveyor, Lloyd's Register of Shipping, Liverpool, regarding St George, 30th May 1905 1905, Letter from R Williamson, Principal Surveyor, to A Scott Esq, London, regarding St George, 28th September 1906 1906, Engine Forgings Form for St George, 25th September 1906 1906, Letter from R Williamson, regarding St George, 10th September 1906 1906, Letter from James Bradley, to The Principal Surveyor, Liverpool, regarding St George, 10th September 1906 1906, Letter from R Williamson, to Hill, regarding St George, 7th September 1906 1906, Copy of Letter to R Williamson, regarding St George, 7th September 1906 1906, Copy of Letter from Secretary, to R Williamson Esq, Liverpool, regarding St George, 7th September 1906 1906, Letter from W L Clark, to A Scott Esq, London, regarding St George, 6th September 1906 1906, Telegram from Hill, Lloyd\'s Register, London to Williamson, Care Register, Liverpool, regarding St George, 7th September 1906 1906, Telegram from R Williamson, Lloyd\'s Register, Liverpool, to Hill, Lloyd\'s Committee, London regarding St George, 7th September 1906 1906, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding first entry for St George, 5th September 1906 1906, Steel Steamer Report for St George, 3rd September 1906 1906, Freeboard Verification Form for Steamers for St George, 17th July 1906 1906, Report on Machinery for St George, 3rd September 1906 1906, Engine Forgings Form for St George, 1st January 1906 1906, Engine Forgings or Castings Form for St George, 1st January 1906 1906, Engine Castings Form for St George, 21st March 1906 1906, Form for Vessels of 100 Tons & Upwards for St George, 4th July 1906 1906, Memo regarding classification for St George, 14th April 1921 1921, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding boiler for St George, 6th April 1921 1921, Letter from W H Caych, Marine Superintendent, to Secretary, Lloyds Register of Shipping, London, regarding St George, 4th April 1921 1921, Letter from A T Graham, to The Secretary, London, regarding St George, 4th April 1921 1921, Copy of Fragment of document regarding St George, Undated no date, List of Plans Attached for St George, Undated no date, Report of Survey for Repairs, &c for St George, Undated no date, List of sizes of pumps for St George, undated no date, Report on Electric Lighting Installation for St George, Undated no date )

Type and configuration of the engine(s) supplied for a vessel.

The port in which a vessel is registered or permanently based.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.