Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Spartan ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Sleipner ( Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
The process of transferring a vessel to water, but not necessarily her completion.
10/01/1876 ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Unique identifier for a given ship, it is assigned by a builder.
325 ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
A vessel’s means of propulsion.
Steam ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Is the steamer assisted by sail?
No ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Is machinery fitted at the aft of the vessel?
No ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
The individual and/or organisation listed
Edward Shotton & Co ( Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876 )
E Shotton & Co ( Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880 )
M Sportale ( Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878 )
E Shotton ( Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880 )
C Michelson & Co ( Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
C Michelsen & Co ( Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Type and configuration of the engine(s) supplied for a vessel.
Inverted Compound Surface Condensing ( Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876 )
Date in which construction of a vessel’s engines were completed.
1876 ( Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
1868 ( Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John Cooper ( Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880 )
Cooper ( Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878 )
Patton ( Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878 )
J Cooper ( Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880 )
J Jonassen ( Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1; A & CP; 2 Dks Iron Dk; 3 Tier beam ( Iron Ship Report for Spartan, 9th March 1876 1876 )
100A1 ( Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879 )
+100A1; Record S S No 1/1880 ( Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880 )
+100A1; S S No 1,80; Lloyd's Mc 10,80 ( Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880 )
+100A1; 1,80; Lloyd's Mc 1,80 ( Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880 )
Missing since 2,93 ( Report of total loss and casualty for Sleipner, 11 May 1893 1893 )
The name of the port/place of destination given.
Bombay ( Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879 )
Wales; Cardiff ( Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880 )
United States ( Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880 )
Leith ( Report of total loss and casualty for Sleipner, 11 May 1893 1893 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880 )
The port in which a vessel is registered or permanently based.
Bergen, Norway ( Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
The year in which a vessel’s construction is completed.
1876 ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
C Mitchell & Co ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880 )
Charles Mitchell & Co ( Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Does the vessel possess an auxiliary power source?
No ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Is electric lighting fitted to the vessel?
No ( Particulars of Boilers for Spartan, 3rd March 1876 1876, Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880 )
Lon ( Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
Location where a vessel’s survey was undertaken.
Stockton & Low Walker ( Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876 )
Newcastle ( Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880 )
Cardiff ( Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878 )
Hull ( Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878 )
Southampton ( Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879 )
Liverpool ( Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880 )
Dunbartonshire ( Half Midship Section Plan for Spartan, 1880 1880 )
London ( Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Location of construction for a vessel’s engines.
Stockton ( Engineer Surveyor's Report on Machinery for Spartan, 3rd March 1876 1876, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
Port Glasgow ( Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878 )
The listed port to which a given vessel belongs.
London ( Iron Ship Report for Spartan, 9th March 1876 1876, Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878, Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878, Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880, Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880 )
Name of surveyor.
Thomas H Cooke; George P Cooper ( Iron Ship Report for Spartan, 9th March 1876 1876 )
Henry T Tyrrell ( Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878 )
A E Keydell ( Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878 )
Thomas Phillips ( Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879 )
Thomas Shilston ( Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880 )
John George Kinghorn ( Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880 )
Charles Davidson ( Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880 )
Maurice Ritson ( Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
Recorded information related to a vessel’s movements.
Newcastle; Bombay ( Iron Ship Report for Spartan, 9th March 1876 1876 )
Southampton; Bombay ( Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879 )
Liverpool; Wales; Cardiff ( Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880 )
Newcastle; United States ( Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880 )
South East of Cape Vincent ( Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1535 ( Iron Ship Report for Spartan, 9th March 1876 1876 )
1557 ( Report of Survey for Repairs, &c for Spartan, 16th September 1878 1878 )
1263 ( Report of Survey for Repairs of Engines & Boilers for Spartan, 18th April 1878 1878 )
1537 ( Report of Survey for Repairs, &c for Spartan, 22nd January 1879 1879, Report of Survey for Repairs, &c for Spartan, 10th January 1880 1880, Report of Survey for Repairs of Engines & Boilers for Spartan, 13th October 1880 1880 )
1000 ( Report of Survey for Repairs of Engines & Boilers for Spartan, 10th January 1880 1880 )
1796 ( Report of Survey for Repairs, &c for Spartan, 13th October 1880 1880, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
1172 ( Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Half Midship Section Plan for Spartan, 1880 1880, Plan Shewing New Poop & Covering in Amidships for Spartan, 1880 1880, Plan Showing Areas of Present Angle Iron & Keelson Plates in Ship, also Proposed Compensation for Lengthening for Spartan, 2nd September 1880 1880, Half Midship Section Plan for Spartan, 1880 1880, Report of Survey for Repairs, &c, of Engines & Boilers for Sleipner, 18th June 1888 1888, Note regarding the donkey boiler of Sleipner, 15 December 1892 1892, Report of total loss and casualty for Sleipner, 11 May 1893 1893, Correspondence from Chr Michelsen & Co to the Secretary of Lloyd’s Register confirming Sleipner is missing, 1 May 1893 1893 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.