Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Red Sabre ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Portsdown ( Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942 )
Sollurn ( Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946 )
Hargood ( Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950 )
The process of transferring a vessel to water, but not necessarily her completion.
24/09/1941 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
685 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Location where a vessel’s survey was undertaken.
London ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950 )
Beverley; Hull ( Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942 )
Hull ( Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949 )
Grimsby ( Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949 )
Grimsby; Hull ( Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949 )
Newcastle on Tyne ( Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949 )
Manchester ( Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Is electric lighting fitted to the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
The official record pronounced by the Committee
To be broken up ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Cork ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
The individual and/or organisation listed
The Admiralty ( Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942 )
Grimsby Motor Trawlers Ltd ( Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
511 ( Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942 )
524 ( Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949 )
505 ( Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Location of construction for a vessel’s engines.
The listed port to which a given vessel belongs.
Grimsby ( Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949 )
Recorded information related to a vessel’s movements.
Grimsby; Fishing ( Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949 )
The port in which a vessel is registered or permanently based.
Grimsby ( Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949 )
The year in which a vessel’s construction is completed.
1942 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cook Welton & Gemmell Ltd ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Beverley ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
A vessel’s means of propulsion.
Steam ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Is the steamer assisted by sail?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking up at Cork ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Red Sabre, 24th March 1942 1942, Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Portsdown, 23rd March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942, Plan of Alterations to Pipe Work for Superheater Conversion for Sollurn, 22nd August 1946 1946, Plan of Superheater Elements for Sollurn, 2nd July 1946 1946, Plan of Arrangement of Superheater for Sollurn, 2nd July 1946 1946, Plan of Headers for Sollurn, 2nd July 1946 1946, Plan of Detail of Proposed Horizontal Girder for Oil Fuel Bunkers for Hargood, 1949 1949, Plan of Pipe Arrangement for Conversion to Oil Fuel Burning for Hargood, 1949 1949, Plan of Oil Fuel Bunkers for Hargood, 30th May 1949 1949, Report on Masts, Spars, & Rigging for Hargood, 6th December 1949 1949, Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Copy of Certificate of Examination & Testing for Hargood, 21st September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 22nd September 1949 1949, Copy of Certificate of Inspection & Testing for Hargood, 31st October 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Hargood, 18th January 1950 1950, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engines & Boilers of Hargood, 28th January 1950 1950, Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942, Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942, Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942 )
Gms ( Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949, Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Steam Trawler for Government Service; Lloyds A & CP; ESD; OL; +LMC 3,42; FD; CL ( Steel Steamer Trawler Report for Portsdown, 13th March 1942 1942 )
+LMC 3,42; FD; CL ( Report on Steam Reciprocating Engine Machinery for Portsdown, 5th March 1942 1942 )
See Hul FE 51550 ( Report on Boilers for Portsdown, 16th February 1942 1942, Report on Electrical Equipment for Portsdown, 18th March 1942 1942 )
11,49 Gms; S S Gms 12,49; +LMC 12,,49; Fitted for Oil Fuel 12,49 FP above 150 F ( Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949 )
+LMC 12,49; Fitted for Oil fuel ( Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949 )
+100A1; Trawler 11,63; SS 12,62; +LMC 12,62; BS M 11,63; SP 1,62; TS N1,62 CL ( Report of Total Loss, Casualty, Breaking Up, etc for Red Sabre, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Date in which construction of a vessel’s engines were completed.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Grimsby Industries (Trawler) Ltd ( Report of Survey for Repairs, &c for Hargood, 17th December 1949 1949 )
Grimsby Industries Ltd ( Report of Survey for Repairs of Engines & Boilers for Hargood, 17th December 1949 1949 )
The name of the port/place of destination given.
Physical arrangement of a ship’s masts, sails and rigging.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.