Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Sensan Maru ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
25/05/1929 ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
160 ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Location where a vessel’s survey was undertaken.
Copenhagen ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929 )
Kobe ( Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929 )
Tama; Kobe ( Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929 )
Dairen ( Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937 )
London ( Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Report of Survey for Repairs, &c for Sensan Maru, Undated no date )
A vessel’s means of propulsion.
undefined ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date )
Motor (internal combustion) ( Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Is the steamer assisted by sail?
No ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Is electric lighting fitted to the vessel?
No ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
A vessel’s calculated maximum speed.
1928 ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928 )
1929 ( Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929 )
1937 ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937 )
1938 ( Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938 )
ated ( Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
QCAF ( Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Kob ( Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929 )
Cpn ( Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929 )
Lon ( Report of Survey for Repairs, &c for Sensan Maru, Undated no date )
The individual and/or organisation listed
Dairen Kisen Kaisha ( Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Report of Survey for Repairs, &c for Sensan Maru, Undated no date )
Dairen Kisen Kabushiki Kaisha ( Memo for Sensan Maru, 6th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2776 ( Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Solid Injection Trunk Piston ( Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929 )
Vertical Diesel Oil Engine (Trunk Type Solid Injection) ( Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929 )
The year in which a vessel’s construction is completed.
1929 ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Mitsui Bussan Kaisha ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Tama ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Screw Motor Vessel ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Location of construction for a vessel’s engines.
Copenhagen ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929 )
Is machinery fitted at the aft of the vessel?
No ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
1928 ( Engine Forgings & Castings Form for Sensan Maru, 28th December 1928 1928, Engine Forgings Form for Sensan Maru, 23rd November 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 10th December 1928 1928, Engine Forgings Form for Sensan Maru, 28th December 1928 1928 )
1929 ( Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Sensan Maru, 13th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Examination for Sensan Maru, 17th July 1929 1929, Memo regarding Classification for Sensar Maru, 13th August 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Memo submitting that copy of report for Sensan Maru is sent to the Kobe surveyors for their guidance & completion, 28th June 1929 1929, Engine Forgings Form for Sensan Maru, 17th April 1929 1929, Engine Forgings Form for Sensan Maru, 24th January 1929 1929, Engine Forgings Form for Sensan Maru, 11th April 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929 )
1937 ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Sensan Maru, 29th December 1937 1937, Copy of Letter from John Sim, to The Secretary, London, regarding Sensan Maru & related vessels, 27th November 1937 1937, Copy of Letter from N Yokota, The Manager, Superintendent Department, for The Dairen Kisen Kaisha, to John Sim Esq, Surveyor to Lloyd's Register of Shipping, Dairen, regarding Sensan Maru, 25th November 1937 1937 )
1938 ( Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938, Memo for Sensan Maru, 6th January 1938 1938, Copy of Letter from Secretary, to The Dairen Kisen Kabushiks Kaisha, Dairen, regarding Sensan Maru, 7th January 1938 1938 )
0000 ( Memo regarding Classification for Sensan Maru, Undated no date, Report of Survey for Repairs, &c for Sensan Maru, Undated no date, List of Spare Gear for Sensan Maru, Undated no date, Construction Profile, Decks & Inner Bottom Plan for Sensan Maru, Undated no date, Half Midship Section Plan for Sensan Maru, Undated no date )
Name of surveyor.
Clive Bell ( Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 7th August 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 11th July 1929 1929, Letter from Clive Bell, to The Secretary, London, regarding Sensan Maru, 16th July 1929 1929, Steel Motorship Report for Sensan Maru, 11th July 1929 1929, Copy of Certificate of Survey for Sensan Maru, 12th July 1929 1929, Copy of Certificate of Survey of Boiler & Machinery for Sensan Maru, 12th July 1929 1929, Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929, Report on Electric Fittings for Sensan Maru, 11th July 1929 1929 )
The port in which a vessel is registered or permanently based.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyds A & CP; Cargo Battens not Fitted; +LMC 7,29 CL; Oil Engines DB 100 Ib ( Steel Motorship Report for Sensan Maru, 11th July 1929 1929 )
+LMC 7,29 CL; Oil Engines DB 100 Ib ( Report on Oil Engine Machinery for Sensan Maru, 11th July 1929 1929 )
See Minute on Kobe Rpt 6576 ( Report on Oil Engine Machinery for Sensan Maru, 19th June 1929 1929, Report on Donkey Boiler for Sensan Maru, 11th July 1929 1929 )
Elec Light ( Report on Electric Fittings for Sensan Maru, 11th July 1929 1929 )
Withdraw Class & Insert (...) ( Report of Survey for Repairs, &c for Sensan Maru, Undated no date )
The listed port to which a given vessel belongs.
Date in which construction of a vessel’s engines were completed.
Have you noticed missing or incorrect data or images for this ship?