Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Savan ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
The process of transferring a vessel to water, but not necessarily her completion.
__/10/1896 ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Unique identifier for a given ship, it is assigned by a builder.
318 ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Location where a vessel’s survey was undertaken.
South Shields ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901 )
Newcastle ( Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896 )
South Shields; Newcastle ( Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896 )
London ( Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899 )
Newcastle on Tyne ( Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901 )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
undefined ( Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896 )
Sail ( Report of Survey for Repairs, &c for Savan, 16th March 1899 1899 )
Is the steamer assisted by sail?
No ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Location of construction for a vessel’s engines.
South Shields ( Engine Forgings Form for Savan, 14th July 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
The listed port to which a given vessel belongs.
London ( Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
J Scrutton & Sons ( Steel Steamer Report for Savan, 22nd October 1896 1896 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; Spar Dk; A & CP; +LMC 10,96; FD; 1 DK (Steel) & Spar Dk (Stl) & Deep Framing ( Steel Steamer Report for Savan, 22nd October 1896 1896 )
+LMC 10,96; FD ( Report on Machinery for Savan, 8th October 1896 1896 )
+100A1 Spar dk ( Report of Survey for Repairs, &c for Savan, 9th April 1897 1897 )
+100A1; Spar dk; 10,96; +LMC 10,96 ( Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897 )
+100A1 3,98; Spar Dk; +LMC 10,96 ( Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898 )
+100A1 Spar Dk ( Report of Survey for Repairs, &c for Savan, 12th December 1898 1898 )
Deferred ( Report of Survey for Repairs, &c for Savan, 16th March 1899 1899 )
+100A1; Spar Dk 12,98; +LMC 10,96 ( Report of Survey for Repairs, &c for Savan, 7th June 1899 1899 )
+100A1 Spar Deck ( Report of Survey for Repairs, &c for Savan, 20th August 1899 1899 )
+100A1 12,98; Spar Dk; +LMC 10,96 ( Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899 )
+100A1 8,99; Spar dk; In red; +LMC 10,96 ( Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899 )
+100A1 spar dk 10.20; ss no3 2.09, ss no2.18; in red +LMC MS 12.16, DBS 3.20 +NB 9.19 ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
The name of the port/place of destination given.
London to load for West Indies ( Steel Steamer Report for Savan, 22nd October 1896 1896 )
West Indies ( Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2585 ( Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899 )
2564 ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Date in which construction of a vessel’s engines were completed.
1896 ( Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
2332 ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
260 ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
41.2 ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
The year in which a vessel’s construction is completed.
1896 ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J Readhead & Sons ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
The port or place in which the vessel’s construction took place, at the time of writing.
South Shields ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Screw Steamer ( Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Savan, 1896 1896, Steel Spar Deck Plan for Savan, 1896 1896, Plan of Pumping Arrangement for Savan, 1896 1896, Plan of Cast Steel Single Plate Rudder for Savan, 1896 1896, Plan of Boiler for Savan, 24th January 1896 1896, Plan of Donkey Boiler for Savan, 24th January 1896 1896, Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896, Remarks of the Chief Surveyor to the Classing Committee regarding Class of Savan, 24th October 1896 1896, Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899, Memo for Savan, 17th December 1901 1901, Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901, Letter from John Readhead & Sons, to The Surveyors, Lloyd\'s Register of Shipping, Newcastle on Tyne, regarding Savan, 12th December 1901 1901, Letter from John D Roney, General Manager of Boston Iron and Metal Co, to Lloyd's Register regarding dismantling Santa Clara, 29 January 1923 1923, Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Name of surveyor.
John C Craig ( Engine Forgings Form for Savan, 14th July 1896 1896, Ship Forgings or Castings Form for Savan, 27th February 1896 1896, Ship Castings Form for Savan, 11th June 1896 1896 )
Thomas H Cooke ( Steel Steamer Report for Savan, 22nd October 1896 1896 )
F W Pitt ( Report on Machinery for Savan, 8th October 1896 1896 )
William Moverly ( Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899 )
Duncan Ritchie ( Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899 )
Edward John Tierney ( Report of Survey for Repairs, &c for Savan, 12th December 1898 1898 )
Thomas Shilston ( Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899 )
Thomas Phillips ( Letter from Thomas Phillips, to The Secretary, Lloyd\'s Register of Shipping, London, regarding Savan, 13th December 1901 1901 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc ( Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896 )
Lon ( Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899 )
The individual and/or organisation listed
Scrutton Sons & Co ( Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899 )
James Herbert Scrutton ( Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896 )
Boston Iron & Metal Co ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
George Norris ( Steel Steamer Report for Savan, 22nd October 1896 1896, Report on Machinery for Savan, 8th October 1896 1896, Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896 )
Norris ( Report of Survey for Repairs, &c for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 9th April 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899 )
G Norris ( Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c for Savan, 20th August 1899 1899 )
Recorded information related to a vessel’s movements.
South Shields; London to load for West Indies ( Steel Steamer Report for Savan, 22nd October 1896 1896 )
London; West Indies ( Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 19th December 1898 1898, Report of Survey for Repairs, &c for Savan, 12th December 1898 1898, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899, Report of Survey for Repairs, &c for Savan, 7th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Savan, 23rd August 1899 1899, Report of Survey for Repairs, &c for Savan, 22nd December 1899 1899 )
Physical arrangement of a ship’s masts, sails and rigging.
FAS - Fore & Aft Schooner ( Steel Steamer Report for Savan, 22nd October 1896 1896 )
Sr - Schooner ( Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896, Report of Survey for Repairs, &c for Savan, 16th March 1899 1899 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion on 3 Cranks ( Report on Machinery for Savan, 8th October 1896 1896 )
Triple Expansion Condensing Direct Acting Inverted Cylinders ( Form for Vessels of 100 Tons & Upwards for Savan, 21st October 1896 1896 )
Triple Expansion 3 Cylinders ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
The port in which a vessel is registered or permanently based.
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
1668 ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
312.6 ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
14.9 ( Report of total loss and casualty for Santa Clara, 15 February 1923 1923 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.