Name of ship as recorded on the record

Ship name

Sambre ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

29/08/1919 ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

406 ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Newcastle on Tyne; Sunderland ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919 )

Sunderland ( Steel Steamer Report for Sambre, 8th November 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919 )

Southwick Sunderland ( Plan of Boilers for Sambre, 20th August 1919 1919 )

Kingston, Jamaica, BWI ( Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Sunk ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Atlantic ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Type and configuration of the engine(s) supplied for a vessel.

Location of construction for a vessel’s engines.

Location of engine build

Sunderland ( Report on Machinery for Sambre, 4th November 1919 1919 )

The year in which a vessel’s construction is completed.

Year of ship completion

1919 ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Short Bros Ltd ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sunderland ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950 )

Steam ( Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

27/07/1940 ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 17th December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 31st December 1918 1918, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 4th December 1918 1918, Memo from the Chief Ship Surveyor to the Classing Committee regarding class of Sambre, 12th November 1919 1919, Steel Steamer Report for Sambre, 8th November 1919 1919, Form for Vessels of 100 Tons & Upwards for Sambre, 23rd October 1919 1919, Report on Machinery for Sambre, 4th November 1919 1919, Half Midship Section Plan for Sambre, 1919 1919, Profile & Deck Plans for Sambre, 1st November 1919 1919, Plan of Boilers for Sambre, 20th August 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 7th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 27th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th March 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 29th July 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 26th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 14th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 3rd May 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 1st April 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 15th February 1919 1919, Receipt for materials Manufactured by John Spencer & Sons Ltd for Unknown, 13th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 12th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Sambre, 6th February 1919 1919, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Unknown, 6th February 1919 1919, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Certificate of Survey of Repairs for Sambre, 23rd May 1940 1940, Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940, Memo from the Chief Ship Surveyor to the Classing Committee regarding repairs to Sambre, 21st June 1950 1950, Report of Total Loss, Casualty, &c for Sambre, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Lloyd's A & Cp +LMC 11,19; FD ( Steel Steamer Report for Sambre, 8th November 1919 1919 )

+LMC 11,19; FD ( Report on Machinery for Sambre, 4th November 1919 1919 )

+100A1 11,39; S S11,39; +LMC 12,35; TS CL 11,38; SS Lon No3 8,32; SS Mdb No1,37 ( Report of Survey for Repairs, &c for Sambre, 23rd May 1940 1940 )

+100A1 11,39; S S Lon No 3-8,22; S S Mdb No 1-37; +LMC 12,35; B S 11, 39; T S 11, 38 CL ( Report of Total Loss, Casualty, &c for Sambre, Undated no date )

The name of the port/place of destination given.

The port in which a vessel is registered or permanently based.

Date in which construction of a vessel’s engines were completed.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.