Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Sally Maersk ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

06/01/1923 ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

10 ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Copenhagen ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923 )

Odense ( Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922 )

London ( Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941 )

Odense; Copenhagen ( Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923 )

Liverpool ( Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941 )

Three Rivers; Montreal ( Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941 )

Montreal P Q ( Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941 )

Montreal, Quebec ( Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941 )

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion) ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

undefined ( Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941 )

Steam ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

12/09/1941 ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Shlter Dk with Fbd; Lloyds A & CP; +LMC 4,23; CL; Oil Engines ( Steel Steamer Report for Sally Maersk, 14th May 1923 1923 )

+LMC 4,23; CL; Oil Engines ( Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923 )

+100A1 Shelter Dk; With Freeboard; 5,41; S S Abg No 3-4,35; S S Cpr No 1-39; +LMC CS 10,36; 5,35; DBS 4,40; CL 4,41 ( Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941 )

Deferred ( Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941 )

+100A1; Shelter dk with Fbd 5,41; S S No3-4,35; S S No 1-39; +LMC; CS 10,36 5,35; DS 4; TS 4,41; CL; Oil Engine ( Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Type and configuration of the engine(s) supplied for a vessel.

The name of the port/place of destination given.

The year in which a vessel’s construction is completed.

Year of ship completion

1922 ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Odense Staalskibsværft & A P Moller ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Odense, Denmark ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Motor Vessel ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923 )

undefined ( Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Screw Steamer ( Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Sunk ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Atlantic ( Plan of Shaft for Sally Maersk, 13th March 1922 1922, Plan of Shafts for Sally Maersk, 6th March 1922 1922, Plan of Donkey Boiler for Sally Maersk, 3rd July 1922 1922, Profile & Deck Plan for Sally Maersk, 6th January 19222 1922, Half Midship Section Plan for Sally Maersk, 6th January 1922 1922, Letter from J A A C Von Rosen, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, confirming telegram informing that fees have been paid for Sally Maersk, 22nd May 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Secretary, New York, regarding the replacement of second bower anchor & chain cable, lost on trail trip for the Sally Maersk, 29th May 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Sally Maersk, 28th May 1923 1923, Freeboard Verification Form for Steamers for Sally Maersk, 23rd March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for Sally Maersk, 18th October 1923 1923, Letter from A F Orbech, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, enclosing request forms for newbuildings For Sally Maersk, 8th October 1923 1923, Letter from Assistant to the Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding request forms for the Sally Maersk, 20th September 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, regarding approval of anchors & chains for Sally Maersk, 13th March 1923 1923, Memo regarding the supply of anchors & chain cables for Sally Maersk, 10th March 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, acknowledging receipt of letter regarding equipment supplied for Sally Maersk, 6th March 1923 1923, Letter from Secretary of Lloyd's Register, London, to The Surveyors, Copenhagen, requesting further information regarding chain cable proposed for Sally Maersk, 28th February 1923 1923, Letter from Cyril B Scorer, Surveyor to Lloyd's Register, Copenhagen, to The Secretary, London, regarding to use slightly different weighted anchors from those approved, for Sally Maersk, 26th February 1923 1923, Steel Steamer Report for Sally Maersk, 14th May 1923 1923, Memo regarding classification of the Sally Maersk, 23rd May 1923 1923, Telegram to the Committee, London, stating fees have been paid for Sally Maersk, 22nd May 1923 1923, Report on Oil Engine Machinery for Sally Maersk, 14th May 1923 1923, Report on Boilers for Sally Maersk, 15th May 1923 1923, Report on Electric Lighting Installation for Sally Maersk, 4th April 1923 1923, Letter from Assistant Secretary of Lloyd's Register, London, to Moss Hutchinson Line Ltd, Liverpool, conveying deepest sympathy for the loss of the Sally Maersk, 20th October 1941 1941, Letter from Superintendent Engineer, for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from J H Rea, Superintendent Engineer for Moss Hutchinson Line Ltd, Liverpool, to Lloyd's Register, Wokingham, informing of the loss of the Sally Maersk, 10th October 1941 1941, Letter from Clerk to the Classification Committee of Lloyd's Register, to Moss Hutchinson Line Ltd, Glasgow, regarding damage & repairs to the Sally Maersk, 7th October 1941 1941, Remarks of Chief Ship Surveyor to the Classing Committee regarding repairs for classing of Sally Maersk, 1st October 1941 1941, Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941, Certificate of Survey for Sally Maersk, 4th August 1941 1941, Certificate of Survey of Repairs for Sally Maersk, 31st July 1941 1941, Certificate of Survey of Machinery for Sally Maersk, 31st July 1941 1941, Form from Lloyd's Engineer Surveyor, recommending further examination for Sally Maersk, 31st July 1941 1941, Report of Survey for Repairs, &c, of Engines & Boilers for Sally Maersk, 26th August 1941 1941, Report of Total Loss, Casualty, &c for Sally Maersk, Undated no date )

Physical arrangement of a ship’s masts, sails and rigging.

Recorded information related to a vessel’s movements.

Voyage information

Three Rivers Que; United Kingdom ( Report of Survey for Repairs, &c for Sally Maersk, 20th August 1941 1941 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.