Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Sado Maru ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
11/08/1897 ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
144 ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
The individual and/or organisation listed
Workman Clark & Co ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896 )
Nippon Yusen Kabushiki Kwaisha ( Steel Steamer Report for Sado Maru, 31st May 1898 1898 )
Nippon Yusen Kaisha ( Report on Machinery for Sado Maru, 30th May 1898 1898 )
Nippon Yusen Kwaisha ( Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898 )
Nippon Yusen ( Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899 )
Nippon Zusen Kabushiki Kaisha ( Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899 )
Location where a vessel’s survey was undertaken.
Belfast ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898 )
Glasgow; Belfast; Motherwell ( Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897 )
Hartlepool; Belfast; Spennymoor ( Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897 )
Manchester; Belfast; Leeds ( Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897 )
Glasgow ( Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897 )
Sheffield ( Engine Forgings Form for Sado Maru, 26th March 1898 1898 )
London ( Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899 )
Tilbury; London ( Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Is electric lighting fitted to the vessel?
No ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898 )
Lon ( Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel LA & CP; +LMC 5,98; 2 Dks (Stl-uTeak s ( Steel Steamer Report for Sado Maru, 31st May 1898 1898 )
+LMC 5,98; Elec light ( Report on Machinery for Sado Maru, 30th May 1898 1898 )
+100A1 ( Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899 )
+100A1 6,99; +LMC 5,98 ( Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899 )
The name of the port/place of destination given.
Tokio ( Steel Steamer Report for Sado Maru, 31st May 1898 1898 )
Japan ( Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5898 ( Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899 )
5897 ( Report on Machinery for Sado Maru, 30th May 1898 1898 )
6219 ( Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899 )
Location of construction for a vessel’s engines.
The year in which a vessel’s construction is completed.
1898 ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Workman, Clark & Co Ltd ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
The name of the yard where the vessel was built.
na ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
The listed port to which a given vessel belongs.
undefined ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Tokio ( Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899 )
Name of surveyor.
James Turpin ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898 )
James Craig ( Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897 )
J W Dimmock ( Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897 )
Charles H Jordan ( Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898 )
A L Jones ( Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898 )
A Campbell Holms ( Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899 )
Thomas R Blackie ( Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899 )
A vessel’s means of propulsion.
Steam ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Is the steamer assisted by sail?
No ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Letter from Surveyor James Turpin to the Secretary, London, regarding anchor weight of Sado Maru, 30th September 1896 1896, Plan of Longitudinal Section for Sado Maru, 28th August 1896 1896, Half Midship Section Plan for Sado Maru, 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Plan of Steel Main Boiler for Sado Maru, 25th November 1896 1896, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 24th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 18th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 19th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 11th February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 23rd January 1897 1897, Surveyor's Advice for Tests of Boiler Steel for Sado Maru, 14th January 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 2nd February 1897 1897, Receipt for Boiler Plates, manufactured by David Colville & Sons, for Sado Maru, 15th January 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 2nd April 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 11th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 17th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 26th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 13th February 1897 1897, Receipt for Furnaces, manufactured by The Leeds Forge Co Ltd, for Sado Maru, 20th February 1897 1897, Ship Forgings or Castings Form for Sado Maru, 25th January 1897 1897, Ship Forgings Form for Sado Maru, 9th February 1897 1897, Ship Forgings Form for Sado Maru, 15th July 1897 1897, Plan of Pumping Arrangement for Sado Maru, 1897 1897, Memo from Chief Surveyor to the Classing Committee regarding Class of Sado Maru, 3rd June 1898 1898, Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898, Report on Electric Lighting Installation for Sado Maru, 30th May 1898 1898, Form for Forwarding Midship Section by Lloyd's Surveyor James Turpin for Sado Maru, 27th May 1898 1898, Engine Forgings Form for Sado Maru, 26th March 1898 1898, Form from Surveyor James Turpin to the Secretary, Lloyd's Register London, returning reports for Sado Maru, 16th June 1898 1898, Report of Survey for Repairs, &c for Sado Maru, 16th June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899, Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899, Envelope containing Boiler Plates & Furnaces Forms for Sado Maru, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
James B Murray ( Steel Steamer Report for Sado Maru, 31st May 1898 1898, Report on Machinery for Sado Maru, 30th May 1898 1898 )
W Thomson ( Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899 )
Thomsen ( Report of Survey for Repairs, &c for Sado Maru, 1st December 1899 1899 )
Recorded information related to a vessel’s movements.
Belfast; Tokio ( Steel Steamer Report for Sado Maru, 31st May 1898 1898 )
Tilbury; Japan ( Report of Survey for Repairs, &c, of Engines & Boilers for Sado Maru, 5th December 1899 1899 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Sado Maru, 31st May 1898 1898 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Twin Screws ( Report on Machinery for Sado Maru, 30th May 1898 1898 )
Date in which construction of a vessel’s engines were completed.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.