Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Rudyard Kipling ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
The process of transferring a vessel to water, but not necessarily her completion.
11/11/1920 ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Unique identifier for a given ship, it is assigned by a builder.
686 ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Location where a vessel’s survey was undertaken.
Hull ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921 )
Selby ( Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920 )
Selby; Hull ( Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921 )
London ( Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921 )
Fleetwood; Liverpool ( Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Does the vessel possess an auxiliary power source?
No ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Is electric lighting fitted to the vessel?
No ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
The official record pronounced by the Committee
Sunk (war loss) ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Vessel’s area of loss or disposal/last known recorded location.
Atlantic ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921 )
Liv ( Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
The individual and/or organisation listed
Newington Steam Trawling Co Ltd ( Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921 )
Sun Steam Trawling Co Ltd ( Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steam Trawler; Lloyds A & Cp; +LMC 2,21 ( Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921 )
+LMC 2,21 ( Report on Machinery for Rudyard Kipling, 4th February 1921 1921 )
+100A1 Stm Trawler 8,39; S S No 3-6,33; S S No 1-37; +LMC 10,37; B S 8,39; TS 4,39; CL ( Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939 )
+100A1 Steam Trawler; S S No 1-37; B S 8,39 ( Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939 )
B S 8,39 Subject ( Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
The name of the port/place of destination given.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
333 ( Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Location of construction for a vessel’s engines.
The year in which a vessel’s construction is completed.
1921 ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cochrane & Sons Ltd ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
The port or place in which the vessel’s construction took place, at the time of writing.
Selby ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
A vessel’s means of propulsion.
Steam ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
undefined ( Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939 )
Is the steamer assisted by sail?
No ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Is machinery fitted at the aft of the vessel?
No ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Recorded date for the vessel’s loss or disposal.
16/09/1939 ( Steel Boiler Plan for Rudyard Kipling, 28th October 1916 1916, Profile & Deck Plan for Rudyard Kipling, 27th February 1920 1920, Half Midship Section Plan for Rudyard Kipling, 27th February 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rudyard Kipling, 15th February 1921 1921, Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding lighting installation for Rudyard Kipling, 22nd April 1921 1921, Letter from G P Wells to The Secretary of Lloyds Register, regarding electric lighting installation for Rudyard Kipling, 19th April 1921 1921, Letter from Secretary to The Surveyors, Hull, regarding survey, fees & lighting installation for Rudyard Kipling, 18th April 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Letter from A Walker, Secretary, Per Pro Sun Steam Trawling Co Ltd to Lloyd's Register, Wokingham regarding record of loss for Rudyard Kipling, 11th October 1939 1939, Letter from H W Soar, Secretary to the Liverpool Committee to The Secretary of Lloyds Register, regarding enemy action sinking of Rudyard Kipling, 19th September 1939 1939, Memo to the Chief Ship Surveyor regarding completion survey for Rudyard Kipling, 4th September 1939 1939, Copy of a Letter from Secretary to the Liverpool Committee, to Sun Steam Trawling Co Ltd, Fleetwood, regarding boiler tube report & classification for Rudyard Kipling, 29th August 1939 1939, Report of Total Loss, Casualty, &c for Rudyard Kipling, 16th October 1939 1939, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Memo to the Chief Engineer Surveyor regarding BS for Rudyard Kipling, 4th September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
The listed port to which a given vessel belongs.
Hull ( Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Machinery for Rudyard Kipling, 4th February 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921 )
Fleetwood ( Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Name of surveyor.
Matthew Blackwood ( Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921 )
Recorded information related to a vessel’s movements.
Selby; Hull; Fishing ( Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921 )
Fleetwood; Fishing ( Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch ( Steel Steamer Report for Rudyard Kipling, 14th February 1921 1921, Report on Electric Lighting Installation for Rudyard Kipling, 6th April 1921 1921, Report of Survey for Repairs, &c for Rudyard Kipling, 25th August 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Rudyard Kipling, 25th August 1939 1939 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Rudyard Kipling, 4th February 1921 1921 )
Date in which construction of a vessel’s engines were completed.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.