Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Royal George ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
02/11/1864 ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
London ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Is electric lighting fitted to the vessel?
No ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
M Diarmid Greenshields & Co ( Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890 )
McDiarmid Greenfields & Co ( Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895 )
Recorded information related to a vessel’s movements.
Sunderland; Valparaiso ( Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890 )
London; San Francisco ( Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 Asterisk 1 in Red; Sixth Survey 5/90 ( Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890 )
A1 asterisk 1; 1st Survey 1,95 ( Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895 )
The year in which a vessel’s construction is completed.
1864 ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Westwood Baillie & Co ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Location where a vessel’s survey was undertaken.
Liverpool ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892 )
Sunderland ( Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890 )
London ( Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895 )
A vessel’s means of propulsion.
undefined ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Sail ( Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895 )
Is the steamer assisted by sail?
No ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyds Register, London, requesting to delay the No 6 survey for Royal George, 20th February 1889 1889, Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Remarks of the Chief Surveyor to the Classing Committee regarding class of Royal George, 10th June 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, Lloyd's Register, enclosing a letter connected to report for Royal George, 5th June 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Lloyds Surveyors, Sunderland, regarding when to seal the outside of Royal George, 25th April 1890 1890, Letter from George Harrison, Sunderland Surveyor, to The Secretary, London, regarding the No 6 survey being held for Royal George, 23rd April 1890 1890, Letter from Secretary to The Surveyors, Sunderland, regarding survey for Royal George, 22nd April 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding postponement of No 6 survey for Royal George, 4th August 1891 1891, Letter from Shipbuilder McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, requesting to retain class without completion of No 6 survey for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Telegram from Shipowner McDiarmid Greenshields & Co to Committee of Lloyd's Register, London, requesting to retain class for Royal George, 31st July 1891 1891, Letter from Shipowner McDiarmid Greenshields & Co to The Secretary, Lloyd's Register, London, regarding sealing the outside & completion of survey for Royal George, 30th July 1891 1891, Letter from McDiarmid Greenshields & Co, Liverpool to The Secretary, Lloyd's Register, London regarding entry in Lloyd's book for the Royal George, 23rd July 1891 1891, Memo regarding the No 6 survey for Royal George, 24th July 1891 1891, Memo from McDiarmid Greenshields & Co, Liverpool regarding the completion of second No 3 survey for Royal George, 30th July 1892 1892, Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895, Letter from F E Greenshields of McDiarmid Greenshields & Co, Shipbuilder, to The Secretary, Lloyd's Register, regarding scaling & future voyage of Royal George, Undated no date )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
The name of the port/place of destination given.
Valparaiso ( Iron or Steel Ship Report for Royal George, 17th May 1890 1890, Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890 )
San Francisco ( Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895 )
Name of surveyor.
William Bath ( Report of Survey for Repairs, &c for Royal George, 28th May 1890 1890 )
William Moverly ( Report of Survey for Repairs, &c for Royal George, 2nd January 1895 1895 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.