Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Ronso ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
The process of transferring a vessel to water, but not necessarily her completion.
01/07/1915 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Unique identifier for a given ship, it is assigned by a builder.
329 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Broad categories and subdivisions of vessels related to their purpose or function.
Trawler ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
undefined ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Does the vessel possess an auxiliary power source?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Is electric lighting fitted to the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Steel Steamer Report for Ronso, 2nd December 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915 )
Gms ( Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939 )
Lon ( Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
The individual and/or organisation listed
G F Sleight ( Steel Steamer Report for Ronso, 2nd December 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
George Frederick Sleight ( Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939 )
George F Sleight ( Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Stm Trawler; Lloyds A & CP; +LMC 11,15 ( Steel Steamer Report for Ronso, 2nd December 1915 1915 )
+LMC 11,13 ( Report on Machinery for Ronso, 11th November 1915 1915 )
+100A1; S 6,39; Stm Trawler; BS 6,39 ( Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939 )
BS 6,39 ( Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939 )
Withdraw Class & Insert (. . .) ( Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
The name of the port/place of destination given.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
248 ( Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting Inverted Cylinder ( Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915 )
Triple Expansion ( Report on Machinery for Ronso, 11th November 1915 1915 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1915 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cook, Welton & Gemmell Ltd ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
The port or place in which the vessel’s construction took place, at the time of writing.
Beverley ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
A vessel’s means of propulsion.
Steam ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
undefined ( Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945 )
Is the steamer assisted by sail?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Is machinery fitted at the aft of the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ronso, 3rd December 1915 1915, Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939, Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Special Survey of Boilers of Ronso, 10th July 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Memo for Ronso, 16th October 1945 1945, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Ronso, 28th September 1945 1945, Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
The listed port to which a given vessel belongs.
Grimsby ( Steel Steamer Report for Ronso, 2nd December 1915 1915, Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Location where a vessel’s survey was undertaken.
Beverley; Hull ( Steel Steamer Report for Ronso, 2nd December 1915 1915 )
Grimsby ( Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Letter from G M Cassider, pro Surveyors, to The Secretary, London, regarding Ronso, 24th August 1939 1939, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Letter from Clive Bell, Engineer Surveyor to Lloyd's Register, to G F Sleight Esq, Grimsby, regarding Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Copy of Letter to The Surveyor, Lloyd's Register of Shipping, Grimsby, regarding Ronso, 13th September 1945 1945 )
Hull ( Report on Machinery for Ronso, 11th November 1915 1915, Report on Electric Lighting Installation for Ronso, 9th November 1915 1915 )
Wokingham ( Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 15th December 1939 1939 )
Wokingham; Grimsby ( Question & Answer Memo between Wokingham & Grimsby offices, regarding Ronso being Special Survey, 21st November 1939 1939 )
London ( Copy of Letter from Clerk to the Classification Committee, to The Surveyors, Grimsby, regarding Ronso, 29th August 1939 1939, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
Grimsby; Wokingham ( Copy of Letter from G C Vaux, Surveyor, to The Secretary, Wokingham, regarding Ronso, 14th September 1945 1945 )
Recorded information related to a vessel’s movements.
Beverley; Hull; Fishing ( Steel Steamer Report for Ronso, 2nd December 1915 1915 )
Grimsby; Fishing ( Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939 )
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch ( Steel Steamer Report for Ronso, 2nd December 1915 1915, Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Report of Survey for Repairs, &c for Ronso, 19th June 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939, Report of Survey for Repairs, &c for Ronso, October 1945 1945 )
The port in which a vessel is registered or permanently based.
Grimsby ( Form for Vessels of 100 Tons & Upwards for Ronso, 23rd August 1915 1915, Form of Postponed Surveys for Ronso, 14th December 1939 1939, Form of Postponed Surveys for Ronso, 28th August 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Ronso, 27th June 1939 1939 )
Location of construction for a vessel’s engines.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.